INSP-Final Inspection | 9/29/2016 | 9/29/2016 | 9/29/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete.
|
INSP-Sprinkler Rough-in/Hydro | 9/6/2016 | 9/7/2016 | 9/6/2016 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping located in area of work complete, overhead fire sprinkler piping located in area of work approved for cover.
|
Permit Ready to Issue | | | 9/6/2016 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 9/6/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/6/2016 | | 9/6/2016 | | DONE |
Carlos Velazquez
|
|
|
|
Intake Approval | | | 9/2/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 9/2/2016 | | 9/2/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/2/2016 | | 9/2/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 9/2/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/2/2016 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 9/1/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 1 2016 1:50PM
|