INSP-Final Inspection | 10/1/2017 | 10/2/2017 | 10/2/2017 | P | PASS |
Jim Page
|
|
|
Final fire alarm inspection passed/complete for area of work.
|
INSP-Final Inspection | 3/15/2017 | 3/16/2017 | 3/16/2017 | P | FAIL |
Jim Page
|
|
|
Numerous sync issues with strobes on fire alarm system, sync issue needs to be repaired before inspection can be finaled.
|
Permit Ready to Issue | | | 9/19/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/19/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/19/2016 | | 9/19/2016 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Lee) | 9/8/2016 | | 9/8/2016 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 9/8/2016 | | PASS |
|
|
|
|
Alarm Plan Check | 9/8/2016 | | 9/8/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/8/2016 | | DONE |
|
|
|
Plans approved with review comments.
|
Application received | | | 9/7/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 7 2016 2:22PM
|