Permit Information
Permit NumberFIR16-00573
StatusFinaled
Name ALL VALLEY FIRE
Site Address 519 W PASO FINO DR
Project NameWR Gann 9
Customer Number 
ePlanReviewYes
Description
[WR Gann 9]
The fire sprinkler scope of work consists of protecting a two level single family dwelling per NFPA 13D

[BLD16-02910] - WUI Zone "A", fire sprinklered is required, Class "A" roof required. Permit for the construction of a new 3317 sq. ft., two story (first story 2193 sq. ft., second story 1124 sq. ft.) single family dwelling with 3 bedrooms, 3.5 bathrooms, approximately 546 sq. ft. of covered patio/porch and a 888 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1A/DA zoning and setbacks per planning. **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/28/20173/1/20173/1/2017PPASS
DetailsJim Page
Final fire sprinkler inspection passed/complete
INSP-Final Inspection2/28/20172/28/20172/28/2017PCANC
DetailsJim Page
INSP-Final Inspection2/27/20172/27/20172/27/2017PCANC
DetailsJim Page
Inspection request cancelled per conversation with Jeremy Phone #: ###-####, inspection request will be rescheduled after fire bell is installed.
INSP-Sprinkler Rough-in12/20/201612/21/201612/21/2016APASS
DetailsJim Page
Overhead fire sprinkler pipe tenting complete for piping located in attic spaces, piping in attic spaces approved for cover. Material used for tenting is clear plastic sheeting to cover pipe, blow in insulation will be applied at a later date after sheetrock is installed, prefered method for tenting is batting type insulation to help insure R38 stays over the top of fire sprinkler piping and to maintain the clear pocket between the piping and the sheetrock for radiant heat.
INSP-Sprinkler Rough-in12/6/201612/7/201612/7/2016APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping complete, overhead fire sprinkler located between floors is approved for cover, fire sprinkler piping located in attic spaces cannot be covered until tenting insulation/tenting inspection is complete and passed.
Sprinkler Plan Check11/23/2016 11/23/2016 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  11/23/2016 DONE
DetailsTim Frost
Permit Ready to Issue  11/23/2016 DONE
Issue and Print Permit  11/23/2016 DONE
Inspection Record Card- Fire11/23/2016 11/23/2016 DONE
DetailsChristina Prado
Intake Approval  11/22/2016 PASS
Plan assigned to (Tim)11/22/2016 11/22/2016 DONE
DetailsTim Frost
Sprinkler Plan Check11/22/2016 11/22/2016 FAIL
DetailsTim Frost
1st review completed  11/22/2016 FAIL
DetailsTim Frost
Miscellaneous action  11/22/2016 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Miscellaneous action  10/13/2016 DONE
Asked the FPC the status of this project.
Miscellaneous action  10/13/2016 DONE
FPC said the project will be designed soon.
Application received  9/12/2016 DONE
Application submitted via PDS Online on Sep 12 2016 9:23AM