INSP-Final Inspection | 11/1/2016 | 11/2/2016 | 11/2/2016 | P | PASS |
Katie Marron
|
|
|
Scope of work complete. Permit Finaled.
|
INSP-Final Inspection | 10/31/2016 | 11/1/2016 | 11/1/2016 | A | CANC |
Katie Marron
|
|
|
Trying to coordinate this with the Alarm Inspection and the Life Safety Inspection scheduled for the same date Phone #: ###-#### >> Inspection requested via web by Randy Knutson Inspection cancelled from web by: Randy Knutson
|
INSP-Sprinkler Rough-in/Hydro | 10/28/2016 | 10/28/2016 | 10/28/2016 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping passed/complete, overhead fire sprinkler piping for area of work approved for cover.
|
Intake Approval | | | 9/15/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 9/15/2016 | | 9/15/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/15/2016 | | 9/15/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 9/15/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/15/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 9/15/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/15/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/15/2016 | | 9/15/2016 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 9/14/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 14 2016 4:33PM
|