Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberFIR16-00596
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 6895 S EISENMAN RD
Project NameThe Beechcraft Building
Customer NumberUDG ONLY
ePlanReviewYes
Description
[The BeechCraft Building - UDG only] - Quick Permit
This permit is for the underground portion 8"x52' of the new Beechcraft building to be submitted at a later date.

[BLD16-02176] - Permit to construct a new 52,500 square foot shell and core building. This building is fire sprinklered for unlimited area and utilizes ASHREA 90.1 vs. 2012 IECC. Scope of work includes: construction of poured concrete foundation, construction of reinforced concrete tilt-up exterior walls, construction of new steel bar-joist roof framing / steel pan deck, [construction of interior nonbearing walls to create a vanilla tenant area with: four offices, two accessible restrooms, open office area, server closet], new electrical, new plumbing, new mechanical, new interior / exterior finishes, new accessible doors / hardware, and related site work. NOTE: a separate permit is required prior to occupying this structure and a separate racking permit is required if racks are installed over 8 feet in height. This building is fully fire sprinklered for unlimited area. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/31/20176/2/20176/2/2017PPASS
DetailsJim Page
Final inspection for underground supply passed/complete
INSP-Sprinkler Rough-in/Hydro2/27/20172/28/20172/28/2017APASS
DetailsTroy Cobbley
Underground hydro passed
INSP-Sprinkler Rough-in/Hydro2/24/20172/27/20172/27/2017PCANC
DetailsJim Page
Underground hydro rescheduled for 28FEB2017
INSP-Supply line flush2/24/20172/27/20172/27/2017PDONE
DetailsJim Page
Underground flush complete
INSP-Sprinkler Rough-in/Hydro11/23/201611/23/201611/23/2016PPASS
DetailsJim Page
Rough to cover inspections for underground supply complete, underground supply approved for cover.
Intake Approval  9/21/2016 PASS
Plan assigned to (Tim)9/21/2016 9/21/2016 DONE
DetailsTim Frost
Sprinkler Plan Check9/21/2016 9/21/2016 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  9/21/2016 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  9/21/2016 DONE
DetailsTim Frost
Permit Ready to Issue  9/21/2016 DONE
Issue and Print Permit  9/21/2016 DONE
Inspection Record Card- Fire9/21/2016 9/21/2016 DONE
DetailsKristal Soland
Application received  9/20/2016 DONE
Application submitted via PDS Online on Sep 20 2016 9:51AM