INSP-Final Inspection | 12/19/2016 | 12/20/2016 | 12/20/2016 | P | PASS |
Jim Page
|
|
|
Final inspection for CO2 system interface with premise fire panel passed/complete.
|
Telephone call | | | 10/28/2016 | | DONE |
|
|
|
Michael called to say that a detector over the suppression panel was missed. He will be adding it to a spare zone and note it on the as built drawings. A plasma cutter is in the immediate area so a heat detector is allowed to be installed instead of a smoke detector. Resubmittal is not being required.
|
Permit Ready to Issue | | | 10/4/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/4/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/4/2016 | | 10/4/2016 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Lee) | 9/26/2016 | | 9/26/2016 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 9/26/2016 | | PASS |
|
|
|
|
Alarm Plan Check | 9/26/2016 | | 9/26/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/26/2016 | | DONE |
|
|
|
Quick permit approved with review comments.
|
Application received | | | 9/25/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 25 2016 10:06PM
|