Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberFIR16-00640
StatusFinaled
Name LARSON FIRE PROTECTION LLC
Site Address 4195 N EAGLE RD
Project NameStoragePlus Inc.
Customer Number 
ePlanReviewNo
Description
[StoragePlus Apartment]
The fire sprinkler scope of work consists of protecting a live/work unit per NFPA 13R

The underground piping is under permit FIR16-0045

[BLD16-01291] - Permit for the demolition of an existing building and construction of a new 32,534 sq. ft. building which consists of a 1,050 sq. ft., two story residential unit, 590 sq. ft., one story office, and 30,894 sq. ft. of storage units per the approved engineering and the attached plan review report. The storage and office portions of this building are not fire sprinklered. The residential section of the building is fire sprinklered for R occupancy.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/18/20171/18/20171/18/2017PPASS
DetailsTroy Cobbley
permit finaled
INSP-Final Inspection1/17/20171/17/20171/17/2017PFAIL
DetailsTroy Cobbley
Provide the two additional tamper switches for the backflow preventor and the test papers.
INSP-Final Inspection1/12/20171/13/20171/13/2017PFAIL
DetailsTroy Cobbley
Not ready for inspection. Missing signage on riser door, missing sticker on bell, room is not one hour rated due to holes in the walls, missing canopy on sprinkler beneath stairs, project related undergrond permit has not been scheduled and the underground supply piping has not been flush yet. Need correct outlet to verify single sprinkler flow for testing the flow switch. Need backflow certified.
INSP-Sprinkler Rough-in/Hydro11/4/201611/7/201611/7/2016APASS
DetailsTroy Cobbley
Overhead hydro test passed
INSP-Sprinkler Rough-in/Hydro11/1/201611/2/201611/2/2016APART
DetailsTroy Cobbley
Rough-in passed for the most part except ron stated that he is going to install 401 canopies on the second floor due to light fixture obstructions and the electrician is going to move the lights 3' away on the first floor. So another rough-in will be needed and another hydro test for the overhead system. Pipe sizing and hangers are ok.
Plan assigned to (Tim)10/10/2016 10/21/2016 DONE
DetailsTim Frost
Sprinkler Plan Check10/21/2016 10/21/2016 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  10/21/2016 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  10/21/2016 DONE
DetailsTim Frost
Permit Ready to Issue  10/21/2016 DONE
Telephone call  10/21/2016 DONE
sdcalled Ron to let know permit is ready
Issue and Print Permit  10/21/2016 DONE
Inspection Record Card- Fire10/21/2016 10/21/2016 DONE
DetailsCarlos Velazquez
Intake Approval  10/13/2016 PASS
Plan assigned to (Tim)10/13/2016 10/13/2016 DONE
DetailsTim Frost
Application received  10/10/2016