Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR16-00703
StatusFinaled
Name TRIBAL FIRE SYSTEMS
Site Address 8000 S FEDERAL WAY
Project NameMicron Bldg 51 System 20-6
Customer Number 
ePlanReviewYes
Description
[Micron Building 51 System 20-6]
The fire sprinkler scope of work consists of providing protection for a small portion of the fab level 20.
The system is named LV20-6. The system is a tree design with 6” main and 1 ½” lines.
? FP1 Was reviewed for the riser detail only. The underground is under permit FIR16-00701
[BLD16-01184] - MICRON - Bldg 51 - Steel Super Structure Permit to construct the steel super
structure to a new 168,000 square foot R & D Facility. This permit scope of work was only for the
structural steel construction. No details of the exterior coverings / insulation / Interior Exit stairs / etc.
were provided as part of this permit. Current alternates are submitted; however, assurances were given
that this project will proceed regardless of the approval of the alternates. Foundation permit issued under
BLD16-01184. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/24/20197/25/20197/25/2019APASS
DetailsJim Page
Final fire sprinkler inspection for area of work complete.

Please call Clarence ###-#### Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Final Inspection4/12/20194/12/20194/12/2019PCANC
DetailsJim Page
Per conversation with my supervisor, Adele Schaffeld-Griffin, notes entered reading "Final fire sprinkler sign off of inspections for this permit will be completed at the same time as the life safety inspection is completed under the building permit." Please coordination with the general contractor to schedule the final inspections. Onsite inspection request for today will need to be rescheduled until coordinated inspections for the life safety can be scheduled.

Clarence Phone #: ###-####
INSP-Final Inspection6/30/20176/30/20176/30/2017PPART
DetailsJim Page
Final fire sprinkler inspection for this permit is complete, permit will remain in issued status until construction for this permitted area is complete.
Fees Due Hold6/17/2017 6/30/2017 DONE
DetailsChristina Prado
Fees Due Hold6/15/2017 6/16/2017 DONE
DetailsChristina Prado
INSP-Sprinkler Rough-in/Hydro6/14/20176/15/20176/15/2017APASS
DetailsJim Page
Rough to cover inspection complete for overhead fire sprinkler piping, approved for cover. Hydrostatic test complete for overhead fire sprinklers/piping associated with this system.
Fees Due Hold6/9/2017 6/14/2017 DONE
DetailsChristina Prado
Sprinkler Plan Check6/8/2017 6/8/2017 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  6/8/2017 DONE
DetailsTim Frost
Permit Ready to Issue  6/8/2017 DONE
Issue and Print Permit  6/8/2017 DONE
Inspection Record Card- Fire6/8/2017 6/8/2017 DONE
DetailsChristina Prado
Telephone call  2/27/2017 DONE
DetailsTim Frost
Applicant working on providing letter from RDP verifying and qualifying the exclusion of fire protection in the mechanical chase and interstitial areas; as per NFPA 13-22.23.1.2.1.
Plan resubmittals received  12/20/2016 DONE
Plan assigned to (Tim)12/20/2016 12/20/2016 DONE
DetailsTim Frost
Sprinkler Plan Check12/20/2016 12/20/2016 FAIL
DetailsTim Frost
Plan assigned to (Tim)11/3/2016 11/3/2016 DONE
DetailsTim Frost
Intake Approval  11/3/2016 PASS
Sprinkler Plan Check11/3/2016 11/3/2016 FAIL
DetailsTim Frost
1st review completed  11/3/2016 FAIL
DetailsTim Frost
Miscellaneous action  11/3/2016 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Application received  11/1/2016 DONE
Application submitted via PDS Online on Nov 1 2016 12:38PM