INSP-Final Inspection | 1/17/2017 | 1/18/2017 | 1/17/2017 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 1/16/2017 | 1/17/2017 | 1/17/2017 | A | PASS |
Troy Cobbley
|
|
|
200 lb overhead hydro test passed
|
INSP-Final Inspection | 1/12/2017 | 1/13/2017 | 1/13/2017 | P | FAIL |
Troy Cobbley
|
|
|
Not ready for a final yet still need the 2 hour hydro test and reconnection to the main system. The 24 hour air test passed
|
Sprinkler Plan Check | 1/13/2017 | | 1/13/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/13/2017 | | DONE |
Tim Frost
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/13/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/13/2017 | | DONE |
|
|
|
plan mod ONLY - Do NOT re-issue
|
CHANGE STATUS TO (ISS) | | | 1/13/2017 | | DONE |
|
|
|
as per Tim Frost no fee due
|
INSP-Sprinkler Rough-in/Hydro | 1/11/2017 | 1/12/2017 | 1/12/2017 | P | PART |
Troy Cobbley
|
|
|
Rough-in Inspection passed with the seismic brace added. Started the 24hr Air test at 2:00pm with 50 psi on the guage.
|
INSP-Sprinkler Rough-in | 1/6/2017 | 1/9/2017 | 1/9/2017 | A | PART |
Troy Cobbley
|
|
|
Plan modifications are needed showing the six additional 90's in the 4" main and the missing long. seismic bracing needs to be installed.
|
Sprinkler Plan Check | 11/21/2016 | | 11/21/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2016 | | DONE |
Tim Frost
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/21/2016 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 11/15/2016 | | FAIL |
|
|
|
|
Plan assigned to (Tim) | 11/15/2016 | | 11/15/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 11/10/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/10/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/10/2016 | | 11/10/2016 | | DONE |
Brittany Hill
|
|
|
|
Intake Approval | | | 11/3/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 11/3/2016 | | 11/3/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/3/2016 | | 11/3/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 11/3/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/3/2016 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 11/1/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 1 2016 2:25PM
|