INSP-Final Inspection | 4/4/2017 | 4/5/2017 | 4/5/2017 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 3/23/2017 | 3/24/2017 | 3/23/2017 | A | PASS |
Troy Cobbley
|
|
|
Tenting above the piping in the Storage Rooms and above the Riser rooms has been completed and piping an be covered.
|
INSP-Sprinkler Rough-in | 1/12/2017 | 1/12/2017 | 1/12/2017 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. The tenting only partialy passed. Piping can be covered in the interior of the building but the piping in the exterior storage rooms and the riser room can not be covered.
|
Permit Ready to Issue | | | 11/16/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/16/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/16/2016 | | 11/16/2016 | | DONE |
Candy A. Nichols
|
|
|
|
Sprinkler Plan Check | 11/15/2016 | | 11/15/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 11/15/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/15/2016 | | DONE |
Tim Frost
|
|
|
|
Intake Approval | | | 11/14/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 11/14/2016 | | 11/14/2016 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 11/10/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 10 2016 7:02PM
|