Permit Information
Permit NumberFIR16-00722
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 1452 N ALLUMBAUGH ST
Project NameAberdeen Phase 5 Bldg 2
Customer Number 
ePlanReviewYes
Description
[Aberdeen Phase 5 Building A-2]
The fire sprinkler scope of work consists of CPVC piping is being used with extended coverage residential sprinklers to protect a two level, four-unit apartment building using NFPA 13R

The underground is under permit FIR16-00659

[BLD16-02645] – Permit to construct a new four plex multi-family building with each unit being 1,037 sq. ft.. All unit within this building are two story units with wood framed construction to be constructed per the approved plans and any notations. This building is on its own parcel. This building is to be fully fire sprinklered with an NFPA 13R system.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/24/20173/27/20173/27/2017APASS
DetailsJim Page
Final fire sprinkler inspection passed/complete
INSP-Sprinkler Rough-in/Hydro3/23/20173/23/20173/23/2017PPASS
DetailsTroy Cobbley
The overhead hydro tests passed.
INSP-Final Inspection3/23/20173/23/20173/23/2017PCANC
DetailsTroy Cobbley
Call/ what fits best in your schedule // Robert Phone #: ###-####
INSP-Sprinkler Rough-in1/12/20171/12/20171/12/2017PCANC
DetailsTroy Cobbley
Colton Cox is the contact for this inspection. He is requesting and inspection in Building #1 and #2. His number is ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in12/7/201612/8/201612/8/2016APART
DetailsTroy Cobbley
Rough-in passed and tenting passed and piping can be covered except for the riser room ceiling where the tenting was not complete.
Permit Ready to Issue  11/16/2016 DONE
Issue and Print Permit  11/16/2016 DONE
Inspection Record Card- Fire11/16/2016 11/16/2016 DONE
DetailsCandy A. Nichols
Intake Approval  11/15/2016 PASS
Plan assigned to (Tim)11/15/2016 11/15/2016 DONE
DetailsTim Frost
Sprinkler Plan Check11/15/2016 11/15/2016 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  11/15/2016 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  11/15/2016 DONE
DetailsTim Frost
Application received  11/10/2016 DONE
Application submitted via PDS Online on Nov 10 2016 7:05PM