INSP-Final Inspection | 3/24/2017 | 3/27/2017 | 3/27/2017 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in/Hydro | 3/23/2017 | 3/23/2017 | 3/23/2017 | P | PASS |
Troy Cobbley
|
|
|
The overhead hydro tests passed.
|
INSP-Final Inspection | 3/23/2017 | 3/23/2017 | 3/23/2017 | P | CANC |
Troy Cobbley
|
|
|
Call/ what fits best in your schedule // Robert Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/12/2017 | 1/12/2017 | 1/12/2017 | P | CANC |
Troy Cobbley
|
|
|
Colton Cox is the contact for this inspection. He is requesting and inspection in Building #1 and #2. His number is ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 12/7/2016 | 12/8/2016 | 12/8/2016 | A | PART |
Troy Cobbley
|
|
|
Rough-in passed and tenting passed and piping can be covered except for the riser room ceiling where the tenting was not complete.
|
Permit Ready to Issue | | | 11/16/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/16/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/16/2016 | | 11/16/2016 | | DONE |
Candy A. Nichols
|
|
|
|
Intake Approval | | | 11/15/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 11/15/2016 | | 11/15/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/15/2016 | | 11/15/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 11/15/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/15/2016 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 11/10/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 10 2016 7:05PM
|