INSP-Final Inspection | 1/16/2018 | 1/22/2018 | 1/22/2018 | P | PASS |
Jim Page
|
|
|
Final inspection complete.
|
INSP-Sprinkler Rough-in | 5/9/2017 | 5/10/2017 | 5/9/2017 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground completed on 1/26/2017
|
INSP-Supply line flush | 4/18/2017 | 4/19/2017 | 4/19/2017 | A | DONE |
Jim Page
|
|
|
Underground main supply flush complete
|
INSP-Supply line flush | 1/25/2017 | 1/26/2017 | 1/26/2017 | A | PASS |
Katie Marron
|
|
|
Underground supply pipe ok to cover.
No flush was completed
|
Permit Ready to Issue | | | 12/5/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/5/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/5/2016 | | 12/5/2016 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Lee) | 12/2/2016 | | 12/2/2016 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 12/2/2016 | | PASS |
|
|
|
|
Alarm Plan Check | 12/2/2016 | | 12/2/2016 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 12/2/2016 | | DONE |
|
|
|
Plans approved with review comments.
|
Application received | | | 12/1/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 1 2016 12:08PM
|