Permit Information
Permit NumberFIR16-00794
StatusFinaled
Name JBL FIRE PROTECTION LLC
Site Address 8543 W POCONO ST
Project NameSilvercloud Building #1-2
Customer Number 
ePlanReviewYes
Description
[Silvercloud Building #1-2]
The fire sprinkler scope of work consists of protecting a two level apartment building with a NFPA 13R system. New 2” underground supplies two 2” wet pipe systems. All piping is CPVC piping. The top level piping is to be tented.

Plan Mod 4/18/2017 - Changed sprinklers to a different brand.

[BLD16-02409] – The NFPA 13R fire sprinkler system is used for occupancy. To construct a 2 story apartment building having 6 side-by-side 2 story dwelling units. The dwelling units do not comply as townhomes as defined by the Boise City Code because there are no property lines between them and because the utilities are not separate. This building has a total floor area of about 12,420 square feet (6,871 square feet 1st story and 5,549 square feet 2nd story). Each dwelling unit has 2 stories. None of the dwelling units are required to comply as Type B dwelling units. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud exterior walls, exterior siding, shear walls, wood joist 2nd story floors, doors, windows, interior stairways, gas fireplaces, wood truss roof, roof coverings, millwork, and finishes. Engineered wood trusses are a deferred submittal item. Special Inspection is required for soils, shear walls, diaphragms, concrete, and post-installed anchors. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13R as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/13/201712/14/201712/14/2017APASS
DetailsJim Page
Final fire sprinkler inspection complete.
INSP-Sprinkler Rough-in8/22/20178/23/20178/23/2017PPASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinjkler piping/tenting complete, approved for cover.
INSP-Sprinkler Rough-in/Hydro7/25/20177/26/20177/26/2017PPASS
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping complete.
INSP-Supply line flush7/25/20177/26/20177/26/2017ADONE
DetailsJim Page
Underground main line flush complete
CHANGE STATUS TO (ISS)  5/9/2017 DONE
plan mod paid
Plan Modification Accepted  4/18/2017 DONE
Changed sprinklers to a different brand.
Sprinkler Plan Check4/18/2017 4/18/2017 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  4/18/2017 DONE
INSP-Sprinkler Rough-in3/24/20173/24/20173/24/2017PPASS
DetailsJim Page
Rough to cover inspection for underground supply complete, approved for cover.
Permit Ready to Issue  2/14/2017 DONE
Issue and Print Permit  2/14/2017 DONE
Inspection Record Card- Fire2/14/2017 2/14/2017 DONE
DetailsKristal Soland
Intake Approval  12/29/2016 PASS
Plan assigned to (Tim)12/29/2016 12/29/2016 DONE
DetailsTim Frost
Sprinkler Plan Check12/29/2016 12/29/2016 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  12/29/2016 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  12/29/2016 DONE
DetailsTim Frost
Application received  12/13/2016 DONE
Application submitted via PDS Online on Dec 13 2016 2:43PM