Telephone call | | | 2/10/2017 | | DONE |
|
|
|
Spoke with Kay informing her that the account used to pay on 2/2/17 came back as not foud/incorrect account. Informed her that 150 dollar fee is back in there as well as a 20 dollar fee since that is was the bank charges us when incorrect accounts are entered/
|
INSP-Final Inspection | 2/2/2017 | 2/3/2017 | 2/3/2017 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Plan Modification Accepted | | | 2/2/2017 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/2/2017 | | 2/2/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/2/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/2/2017 | | DONE |
|
|
|
DO NOT REISSUE PLAN MOD
|
CHANGE STATUS TO (ISS) | | | 2/2/2017 | | DONE |
|
|
|
fees for plan mod have been paid
|
INSP-Sprinkler Rough-in | 1/27/2017 | 1/30/2017 | 1/30/2017 | A | PART |
Troy Cobbley
|
|
|
The latest approved plans need to be on site that show the actual project details, retaining straps need to be installed, hangers that are installed need to actually support the pipe, additional coverage is needed at the east end of the new offices. Piping is ok to cover.
|
Intake Approval | | | 1/30/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 1/30/2017 | | 1/30/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/30/2017 | | 1/30/2017 | | PASS |
Tim Frost
|
|
|
As built changes
|
PLANS TAKEN FRONT DESK ALARM | | | 1/30/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/30/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/30/2017 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 1/19/2017 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/19/2017 | | 1/19/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/19/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/19/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 12/21/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/21/2016 | | 12/21/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/21/2016 | | 12/21/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 12/21/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/21/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 12/21/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/21/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/21/2016 | | 12/21/2016 | | DONE |
Brittany Hill
|
|
|
|
Application received | | | 12/14/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 14 2016 3:51PM
|