INSP-Final Inspection | 7/24/2017 | 7/25/2017 | 7/25/2017 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 7/13/2017 | 7/14/2017 | 7/14/2017 | P | FAIL |
Troy Cobbley
|
|
|
Provide test papers and testing of the outside alarm bell when installed. Forward flush passed
|
INSP-Sprinkler Rough-in | 5/3/2017 | 5/3/2017 | 5/3/2017 | P | CANC |
Troy Cobbley
|
|
|
Duplicate inspection
|
INSP-Sprinkler Rough-in | 5/2/2017 | 5/3/2017 | 5/3/2017 | A | PASS |
Troy Cobbley
|
|
|
Earth quake bracing and branchline restraints have been corrected. All piping can be covered
|
Plan Modification Accepted | | | 5/2/2017 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 5/2/2017 | | 5/2/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/2/2017 | | 5/2/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/2/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/2/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/2/2017 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 5/1/2017 | 5/1/2017 | 5/1/2017 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro passed. Piping under the mezzanine ok to cover as branchline restraints have been added.
|
INSP-Sprinkler Rough-in | 4/27/2017 | 4/28/2017 | 4/28/2017 | A | PART |
Troy Cobbley
|
|
|
Rough-in passed for the most part. However I need verification on whether one or two screws are required for the side beam brackets, seismic calculations need to be resubmitted for the actual location of the bracing or install bracing as per plan, it appears that branchline restraints are required for nearly every branchline. Piping can be covered.
|
Plan Modification Accepted | | | 2/8/2017 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/8/2017 | | 2/8/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/8/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/8/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/8/2017 | | 2/8/2017 | | DONE |
Brittany Hill
|
|
|
|
Intake Approval | | | 12/21/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/21/2016 | | 12/21/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/21/2016 | | 12/21/2016 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 12/21/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/21/2016 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 12/21/2016 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/21/2016 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/21/2016 | | 12/21/2016 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 12/15/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 15 2016 9:21AM
|