INSP-Final Inspection | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Sprinkler Rough-in | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Jim Page
|
|
|
Rough in inspection for this system has been completed.
|
INSP-Final Inspection | 7/31/2019 | 8/1/2019 | 8/1/2019 | A | CANC |
Troy Cobbley
|
|
|
Canceling due to manpower shortage and time constraints. Please call Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Final Inspection | 7/31/2019 | 7/31/2019 | 7/31/2019 | P | CANC |
Jim Page
|
|
|
Rescheduled for 01AUG2019 per conversation with point of contact, this request is cancelled.
Please call Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Final Inspection | 4/12/2019 | 4/12/2019 | 4/12/2019 | P | CANC |
Jim Page
|
|
|
Per conversation with my supervisor, Adele Schaffeld-Griffin, notes entered reading "Final fire sprinkler sign off of inspections for this permit will be completed at the same time as the life safety inspection is completed under the building permit." Please coordination with the general contractor to schedule the final inspections. Onsite inspection request for today will need to be rescheduled until coordinated inspections for the life safety can be scheduled.
Clarence Phone #: ###-####
|
INSP-Final Inspection | 6/29/2017 | 6/30/2017 | 6/30/2017 | P | PART |
Jim Page
|
|
|
Final fire sprinkler inspection for this permit is complete, permit will remain in issued status until construction for this permitted area is complete.
|
INSP-Sprinkler Rough-in/Hydro | 6/8/2017 | 6/9/2017 | 6/9/2017 | A | PASS |
Jim Page
|
|
|
Hydrostatic test for systems 10-2 and 10-6 complete.
|
INSP-Sprinkler Rough-in/Hydro | 6/8/2017 | 6/8/2017 | 6/8/2017 | P | CANC |
Jim Page
|
|
|
Hydrostatic test cancelled by contractor, Chris ###-####
|
Fees Due Hold | 2/8/2017 | | 3/14/2017 | | DONE |
Brittany Hill
|
|
|
|
Permit Ready to Issue | | | 2/7/2017 | | DONE |
|
|
|
all met
|
Issue and Print Permit | | | 2/7/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/7/2017 | | 2/7/2017 | | DONE |
Carlos Velazquez
|
|
|
|
Sprinkler Plan Check | 2/6/2017 | | 2/6/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/6/2017 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 2/6/2017 | | DONE |
|
|
|
Sent Ron H and email indicating this project was approved.
|
Telephone call | | | 2/2/2017 | | DONE |
|
|
|
Note: Spoke with applicant 2/02/2017. The applicant indicate the ductwork which is sprinklered is sprinklered because it was combustible. The applicant indicate he did not know what is being material is being conveyed in the ductwork. I explained this information is required and the drawing cannot be approved until this information is provide.
|
Intake Approval | | | 12/27/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/27/2016 | | 12/27/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/27/2016 | | 12/27/2016 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 12/27/2016 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 12/27/2016 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 12/15/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 15 2016 9:34AM
|