INSP-Final Inspection | 2/13/2017 | 2/14/2017 | 2/14/2017 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 1/27/2017 | 1/30/2017 | 1/30/2017 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
|
Sprinkler Plan Check | 1/10/2017 | | 1/10/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/10/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/10/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/10/2017 | | 1/10/2017 | | DONE |
Brittany Hill
|
|
|
|
Plan assigned to (Tim) | 12/19/2016 | | 12/19/2016 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/19/2016 | | 12/19/2016 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
|
Intake Approval | | | 12/19/2016 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/19/2016 | | 12/19/2016 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 12/16/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 16 2016 9:28AM
|