INSP-Final Inspection | 2/20/2018 | 2/21/2018 | 2/21/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 2/15/2018 | 2/16/2018 | 2/16/2018 | A | CANC |
Troy Cobbley
|
|
|
MIKE IS OUR FOREMAN THIS IS IN CONJUNCTION WITH THE ALARM CONTRACTOR Phone #: ###-#### >> Inspection requested via web by Brad Bettencourt
|
INSP-Final Inspection | 2/14/2018 | 2/15/2018 | 2/15/2018 | A | CANC |
Troy Cobbley
|
|
|
MIKE IS OUR FOREMAN FOR THE PROJECT. THIS IS IN CONJUNCTION WITH THE ALARM FINAL Phone #: ###-#### >> Inspection requested via web by Brad Bettencourt Inspection cancelled from web by: Brad Bettencourt
|
INSP-Final Inspection | 2/8/2018 | 2/9/2018 | 2/9/2018 | A | PART |
Troy Cobbley
|
|
|
Could not final due to fire alrm issues. We did however perform the forward flush test which passed.
|
INSP-Sprinkler Rough-in/Hydro | 12/20/2017 | 12/21/2017 | 12/21/2017 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed. Building 300 rough to cover passed. Piping can be covered.
Michael Phone #: ###-####
|
INSP-Sprinkler Rough-in | 11/30/2017 | 12/1/2017 | 12/1/2017 | P | PASS |
Troy Cobbley
|
|
|
The piping above the lay-in ceilings in buildings 1 and 2 is ok for cover.
Mikael Phone #: ###-####
|
INSP-Sprinkler Rough-in | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Troy Cobbley
|
|
|
Remaining piping in the east most building can be covered. Insulation has been added to the combustible concealed spaces.
|
INSP-Sprinkler Rough-in | 9/11/2017 | 9/12/2017 | 9/12/2017 | A | PASS |
Troy Cobbley
|
|
|
Remaining rough-in for the piping in the east most building is passed. Hat track is ok to install but sheet rock is not ok to be installed until insulation in the combustible concealed spaces can be verified.
|
Miscellaneous action | | | 9/7/2017 | | DONE |
|
|
|
Spoke with Brad at TREASURE VALLEY FIRE PROTECTION told him I believe the privacy curtains comply with (Ref: NFPA 13: 8.6.5.2.2.1) and are therefore NOT and obstruction to the sprinklers
|
INSP-Sprinkler Rough-in | 8/31/2017 | 9/1/2017 | 9/1/2017 | A | PART |
Troy Cobbley
|
|
|
See the city approved plans for locations clouded where the sprinkler piping rough-in passed. Hat channel can be installed but piping can not be covered until draft stop/compartments can be verified for the CC2 heads.
|
INSP-Sprinkler Rough-in | 8/16/2017 | 8/16/2017 | 8/16/2017 | P | PASS |
Troy Cobbley
|
|
|
Sheet rock in Building 100 (center building) is ok to cover piping. Columns and double walls have been filled with insulation. Will need another cover inspection when the grid ceiling goes in.
Michael Phone #: ###-####
|
INSP-Sprinkler Rough-in | 8/9/2017 | 8/9/2017 | 8/9/2017 | P | PASS |
Troy Cobbley
|
|
|
Piping rough-in for the center building (100) passed. Piping can not be covered until insulation has been verifed in all combustible concealed spaced.
Mikael Phone #: ###-####
|
INSP-Sprinkler Rough-in | 7/26/2017 | 7/27/2017 | 7/27/2017 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for areas marked where piping is ok to cover for the center building.
Mikael Phone #: ###-####
|
INSP-Sprinkler Rough-in | 7/25/2017 | 7/25/2017 | 7/25/2017 | P | PASS |
Troy Cobbley
|
|
|
The two combustible concealed spaces at the restrooms have been filled with insulation and an additional head at the movable partion wall is approved for cover. This work was in the west most building.
|
INSP-Sprinkler Rough-in | 7/18/2017 | 7/19/2017 | 7/19/2017 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for two corridors where piping is ok to cover in the center building
|
INSP-Sprinkler Rough-in | 7/13/2017 | 7/13/2017 | 7/13/2017 | P | PASS |
Troy Cobbley
|
|
|
Building 200 (west most building) is ok to cover. Combustible concealed spaces have been filled with insulation
|
INSP-Sprinkler Rough-in | 7/11/2017 | 7/12/2017 | 7/12/2017 | P | FAIL |
Troy Cobbley
|
|
|
No inspection was performed due to insulation work has not been completed
|
INSP-Sprinkler Rough-in | 7/6/2017 | 7/7/2017 | 7/7/2017 | P | PART |
Troy Cobbley
|
|
|
The upright heads have been centered but piping can not be covered until I have as-builts and the general contractor has filled the combustible concealed spaces with insulation as discussed
|
Miscellaneous action | | | 7/6/2017 | | DONE |
|
|
|
I reviewed the hydraulic calculations due to the addiontal elbows and it was ok
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/6/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/6/2017 | | DONE |
|
|
|
Tim F accidently put back into review. no extra fees are due
|
INSP-Sprinkler Rough-in | 7/3/2017 | 7/5/2017 | 7/5/2017 | P | FAIL |
Troy Cobbley
|
|
|
Contact plan review about plan modifications due to additional 90's in the 1 1/2" branchlines that effect the hydraulic calculations. Three branchlines need to be modified for spacing in the trusses and insulation needs to be added in the combustible concealed spaces as discussed. I also noted potential obstructions to the side wall sprinkler heads due to light fixtures. Piping can not be covered yet.
|
INSP-Sprinkler Rough-in | 6/23/2017 | 6/26/2017 | 6/26/2017 | A | PASS |
Troy Cobbley
|
|
|
Additional hangers and sway bracing in the south west corridor are ok for cover.
|
INSP-Sprinkler Rough-in | 6/21/2017 | 6/22/2017 | 6/22/2017 | A | PART |
Jim Page
|
|
|
Notated city approved drawings with yellow highlighter/red ink attic area that was inspected and approved for cover. Sway brace attachment points for main in northwest corridor inspected, approved for cover.
|
INSP-Sprinkler Rough-in | 6/12/2017 | 6/13/2017 | 6/13/2017 | P | PART |
Jim Page
|
|
|
See the city approved plans for locations where piping can be covered marked with todays date.
|
INSP-Sprinkler Rough-in | 6/6/2017 | 6/7/2017 | 6/7/2017 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations where piping can be covered marked with todays date.
|
INSP-Conference | 6/5/2017 | 6/5/2017 | 6/5/2017 | P | DONE |
Troy Cobbley
|
|
|
We discussed protection of combustible concealed spaces created by fire blocking.
|
Permit Ready to Issue | | | 1/12/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/12/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/12/2017 | | 1/12/2017 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 1/11/2017 | | 1/11/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/11/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/9/2017 | | 1/9/2017 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 1/9/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 1/9/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 1/6/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 1/6/2017 | | 1/6/2017 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 12/28/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 28 2016 8:58AM
|