INSP-Final Inspection | 5/25/2017 | 5/26/2017 | 5/26/2017 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 5/23/2017 | 5/25/2017 | 5/25/2017 | A | FAIL |
Troy Cobbley
|
|
|
Two concealer heads are located too far from ceiling, two sidewall heads have the shipping clips on them. Flow switches have not been pre-tested. Flow switches do not have covers installed
|
INSP-Sprinkler Rough-in | 4/20/2017 | 4/20/2017 | 4/20/2017 | P | FAIL |
Troy Cobbley
|
|
|
I stopped at the project site and did not make contact with Colton or with Pat. No inspection was performed.
Colton Phone #: ###-####
|
INSP-Sprinkler Rough-in | 4/6/2017 | 4/6/2017 | 4/6/2017 | P | PASS |
Troy Cobbley
|
|
|
Re-routing of the underground piping has been approved. All sprinkler piping in the building can be covered.
|
INSP-Sprinkler Rough-in/Hydro | 4/5/2017 | 4/5/2017 | 4/5/2017 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro passed and tenting in apartments 203 and 204 passed and piping can be covered. However piping can not be covered on the first floor until approved plans have been received that show the underground pipe routing changes.
|
INSP-Sprinkler Rough-in | 3/29/2017 | 3/30/2017 | 3/30/2017 | P | PART |
Troy Cobbley
|
|
|
Todays inspection was for the rough-in for the whole building. 90's are missing at the top and bottom of the second floor feed. The only areas where piping can be covered are in the upstairs apartments 201 and 202 since these were the only two which had tenting. Need resubmittals showing the underground supply piping being routed above ground to the new riser room.
|
Permit Ready to Issue | | | 1/4/2017 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 1/4/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/4/2017 | | 1/4/2017 | | DONE |
Carlos Velazquez
|
|
|
|
Intake Approval | | | 1/3/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 1/3/2017 | | 1/3/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/3/2017 | | 1/3/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 1/3/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/3/2017 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 12/30/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 30 2016 12:53PM
|