INSP-Final Inspection | 6/7/2017 | 6/7/2017 | 6/7/2017 | P | PASS |
Troy Cobbley
|
|
|
permit finaled. Forward flow passed. No storage racking at this time
|
INSP-Sprinkler Rough-in/Hydro | 5/9/2017 | 5/10/2017 | 5/10/2017 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Sprinkler Rough-in/Hydro | 5/8/2017 | 5/9/2017 | 5/9/2017 | A | CANC |
Troy Cobbley
|
|
|
Cancel per John Beazer due to leak found after start of test
|
CHANGE STATUS TO (ISS) | | | 5/8/2017 | | DONE |
|
|
|
plan mod approved and paid
|
Plan Modification Accepted | | | 5/5/2017 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/5/2017 | | 5/5/2017 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 5/5/2017 | | 5/5/2017 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/5/2017 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 5/3/2017 | 5/4/2017 | 5/4/2017 | A | PASS |
Troy Cobbley
|
|
|
Previous corrections have been made except the revised plans do not show the two new heads that may need to be included in the Remote Area 1 calcs. Also many of the pendant heads in the office area are now uprights. Please forward this information to the plan reviewer. All other corrections have been made and rough-in is passed.
|
Plan Modification Accepted | | | 5/1/2017 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 5/1/2017 | | 5/1/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/1/2017 | | 5/1/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/1/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/1/2017 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 4/28/2017 | 5/1/2017 | 4/28/2017 | P | CANC |
Troy Cobbley
|
|
|
John Beazer is the contact for this inspection. He is requesting a rough to cover inspection. Thank you. Phone #: ###-#### >> Inspection requested via web by Kay Haney Inspection cancelled from web by: Kay Haney
|
INSP-Sprinkler Rough-in | 4/26/2017 | 4/27/2017 | 4/27/2017 | P | PART |
Troy Cobbley
|
|
|
Plans need to be resubmitted for plan modifications that include the actual pipe routing and fitting counts, branchline restraints are missing on the two most south west branchlines, branch line restraints are required on the grid branchlines (41'max), FDC is not approved at its current location, heads are spaced too far off of a wall at the west end of the building, piping over Conference room can be recovered, the nuts on the side sammys can be unthreaded by finger so they need to be tightened down.
|
Sprinkler Plan Check | 1/6/2017 | | 1/6/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/6/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/6/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/6/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/6/2017 | | 1/6/2017 | | DONE |
Kristal Soland
|
|
|
|
Sprinkler Plan Check | 1/5/2017 | | 1/5/2017 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 1/5/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 1/5/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 1/4/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 1/4/2017 | | 1/4/2017 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 1/3/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 3 2017 4:11PM
|