INSP-Final Inspection | 6/19/2017 | 6/21/2017 | 6/21/2017 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Supply line flush | 4/24/2017 | 4/25/2017 | 4/25/2017 | A | PASS |
Troy Cobbley
|
|
|
Inspection was for overhad hydro which passed
|
INSP-Sprinkler Rough-in | 3/23/2017 | 3/23/2017 | 3/23/2017 | P | PASS |
Troy Cobbley
|
|
|
Tenting inspection passed. Piping can be covered.
|
INSP-Sprinkler Rough-in | 3/21/2017 | 3/22/2017 | 3/22/2017 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler rough-in passed. Tenting is not complete so no piping can be covered.
|
INSP-Sprinkler Rough-in | 3/13/2017 | 3/14/2017 | 3/14/2017 | A | PASS |
Troy Cobbley
|
|
|
The overhead rough-in passed. Tenting was not completed yet. Piping can not be covered
|
Permit Ready to Issue | | | 2/16/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/16/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/16/2017 | | 2/16/2017 | | DONE |
Candy A. Nichols
|
|
|
|
Intake Approval | | | 1/13/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 1/13/2017 | | 1/13/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/13/2017 | | 1/13/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 1/13/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/13/2017 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 1/6/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 6 2017 2:47PM
|