INSP-Final Inspection | 7/12/2017 | 7/13/2017 | 7/13/2017 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection passed/complete
|
Permit Ready to Issue | | | 2/8/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/8/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/8/2017 | | 2/8/2017 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 2/7/2017 | | DONE |
|
|
|
Complete new design from a new design contractor.
|
Alarm Plan Check | 2/7/2017 | | 2/7/2017 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 2/7/2017 | | DONE |
|
|
|
Plans approved with review comments.
|
Alarm Plan Check | 2/3/2017 | | 2/3/2017 | | FAIL |
Lee G Meredith
|
|
|
See review comments
|
Telephone call | | | 2/3/2017 | | DONE |
|
|
|
Adam called to discuss existing design issues. He indicated that he will be send the re-design tasks to Stephannie Cobbley for correction with a plan to resubmit on 2/6/17.
|
Miscellaneous action | | | 2/3/2017 | | DONE |
|
|
|
Emailed review comments to Adam.
|
Plan resubmittals received | | | 2/2/2017 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/31/2017 | | DONE |
|
|
|
|
Miscellaneous action | | | 1/31/2017 | | DONE |
|
|
|
Scale graph appears to be incorrect. Emailed Adam to have him verify. He requested I fail the project so corrections can be made.
|
Plan resubmittals received | | | 1/17/2017 | | DONE |
|
|
|
New drawings submitted but loaded into wrong folder. Product data and calcs not provided in upload. 601 checklist form missing. Emailed Adam to let him know that I was going to fail the pre-screen so he could upload all forms & drawings into the proper folders.
|
Application received | | | 1/13/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 13 2017 1:37PM
|
Plan assigned to (Lee) | 1/13/2017 | | 1/13/2017 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 1/13/2017 | | DONE |
|
|
|
Failed pre-screen review. Missing scale graph.
|