INSP-Sprinkler Rough-in | 4/7/2017 | 4/7/2017 | 4/7/2017 | P | PASS |
Scott Arellano
|
|
|
Please call me about 45 min before you will be there. The job is in east boise and I am in Meridian so it''ll take me a minute to get there. Thanks, Brett Phone #: ###-#### Inspection requested via web by Brett Lawatch
|
INSP-Final Inspection | 4/7/2017 | 4/7/2017 | 4/7/2017 | P | PASS |
Scott Arellano
|
|
|
Please call me about 45 min before you will be there. The job is in east boise and I am in Meridian so it''ll take me a minute to get there. Thanks, Brett Phone #: ###-#### Inspection requested via web by Brett Lawatch
|
Sprinkler Plan Check | 1/27/2017 | | 1/27/2017 | | PEND |
Tim Frost
|
|
|
On hold pending new calculations.
|
Sprinkler Plan Check | 1/27/2017 | | 1/27/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/27/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/27/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/27/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/27/2017 | | 1/27/2017 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 1/23/2017 | | 1/23/2017 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 1/23/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 1/23/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 1/23/2017 | | PASS |
|
|
|
|
Application received | | | 1/18/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 18 2017 7:36AM
|
Intake Approval | | | 1/18/2017 | | FAIL |
|
|
|
Needs a 606 form in addition what is within 15' of the rack
|
Plan assigned to (Tim) | 1/18/2017 | | 1/18/2017 | | DONE |
Tim Frost
|
|
|
|