INSP-Final Inspection | 4/3/2017 | 4/4/2017 | 4/4/2017 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in | 3/23/2017 | 3/24/2017 | 3/24/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/pendant heads on level 1 complete, level 1 approved for cover.
|
INSP-Sprinkler Rough-in | 2/23/2017 | 2/23/2017 | 2/23/2017 | P | PART |
Jim Page
|
|
|
Rough to cover inspection on level 2 stairs complete, approved for cover.
|
INSP-Sprinkler Rough-in | 2/21/2017 | 2/22/2017 | 2/22/2017 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping on level 2 complete, level 2 approved for cover.
|
Plan Modification Accepted | | | 2/6/2017 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/6/2017 | | 2/6/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/6/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/6/2017 | | DONE |
|
|
|
DO NOT REISSUE PLAN MOD
|
CHANGE STATUS TO (ISS) | | | 2/6/2017 | | DONE |
|
|
|
Plan Mod
|
(F) Reprint permit | | | 2/6/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/30/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/30/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/30/2017 | | 1/30/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 1/27/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 1/27/2017 | | 1/27/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/27/2017 | | 1/27/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 1/27/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/27/2017 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 1/25/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 25 2017 12:43PM
|