DOC - Permit Finaled | | | 2/8/2017 | | DONE |
|
|
|
Per Troy there should have been a final inspection not a rough in. Ok to close this permit
|
INSP-Sprinkler Rough-in | 1/27/2017 | 1/30/2017 | 1/30/2017 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Application received | | | 1/27/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 27 2017 1:01PM
|
Plan assigned to (Lee) | 1/27/2017 | | 1/27/2017 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 1/27/2017 | | PASS |
|
|
|
|
Alarm Plan Check | 1/27/2017 | | 1/27/2017 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 1/27/2017 | | DONE |
|
|
|
Quick permit approved without review comments.
|
Permit Ready to Issue | | | 1/27/2017 | | DONE |
|
|
|
all requirments met
|
Issue and Print Permit | | | 1/27/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/27/2017 | | 1/27/2017 | | DONE |
Carlos Velazquez
|
|
|
|
Permit Ready to Issue | | | 1/27/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/27/2017 | | DONE |
|
|
|
was changed to fee by mistake
|