Permit Information
Permit NumberFIR17-00065
StatusFinaled
Name TRIBAL FIRE SYSTEMS
Site Address 8000 S FEDERAL WAY
Project NameMicron Bldg 51 System 10-1
Customer Number 
ePlanReviewYes
Description
[Micron Building 51 - System 10-1 - C24074]
The fire sprinkler scope of work consists of part of the subfab area. The system is designed as a 4”x4”x 1 ½” grid with a looped primary main. The sprinklers are center in the intersections of the waffle ceiling. The system is designed based on OH II for 3000 ft² per IFC for Semiconductor H5. Extensive under duct protection is being provided.

• The underground is under permit FIR16-00701
• See addendum for graphic scope of work

Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.

[BLD16-03440] - For the construction of a new one story building with a basement for a fabrication and R&D facility to include related site work. The building includes a 149,327 sq. ft. basement, a 164,022 sq. ft. first story and a 33,638 sq. ft. equipment platform. This building is fully fire sprinklered and alarmed for H occupancy. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/7/20198/7/20198/7/2019PPASS
DetailsJim Page
Final fire sprinkler inspection for area of work complete.

Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Sprinkler Rough-in/Hydro8/7/20198/7/20198/7/2019PDONE
DetailsJim Page
Hydrostatic test has been witnessed, no pressure loss was observed.
INSP-Sprinkler Rough-in8/7/20198/7/20198/7/2019PPASS
DetailsJim Page
Rough in inspection for this system has been completed.
INSP-Final Inspection7/31/20198/1/20198/1/2019ACANC
DetailsTroy Cobbley
Canceling due to manpower shortage and time constraints. Please call Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Final Inspection7/31/20197/31/20197/31/2019PCANC
DetailsJim Page
Rescheduled for 01AUG2019 per conversation with point of contact, this request is cancelled.

Please call clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Final Inspection7/31/20197/31/20197/31/2019PCANC
DetailsJim Page
Rescheduled for 01AUG2019 per conversation with point of contact, this request is cancelled.

Please call clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
Fees Due Hold6/17/2017 9/13/2017 DONE
DetailsBrittany Hill
Fees Due Hold6/6/2017 6/16/2017 DONE
DetailsChristina Prado
Sprinkler Plan Check6/5/2017 6/5/2017 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  6/5/2017 DONE
DetailsTim Frost
Permit Ready to Issue  6/5/2017 DONE
Issue and Print Permit  6/5/2017 DONE
Inspection Record Card- Fire6/5/2017 6/5/2017 DONE
DetailsChristina Prado
Sprinkler Plan Check3/2/2017 3/2/2017 FAIL
DetailsTim Frost
Miscellaneous action  3/2/2017 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Sprinkler Plan Check2/21/2017 2/21/2017 FAIL
DetailsTim Frost
1st review completed  2/21/2017 FAIL
DetailsTim Frost
Miscellaneous action  2/21/2017 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Intake Approval  2/17/2017 PASS
Plan assigned to (Tim)2/17/2017 2/17/2017 DONE
DetailsTim Frost
Application received  2/14/2017 DONE
Application submitted via PDS Online on Feb 14 2017 2:49PM