INSP-Final Inspection | 6/12/2017 | 6/13/2017 | 6/13/2017 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 5/18/2017 | 5/19/2017 | 5/19/2017 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
Plan Modification Accepted | | | 4/27/2017 | | PASS |
|
|
|
As Built
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/27/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 4/27/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/27/2017 | | DONE |
|
|
|
Plan Mod. No fees due per Tim F
|
INSP-Sprinkler Rough-in | 4/25/2017 | 4/26/2017 | 4/26/2017 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered. As-builts need sent to plan review
|
INSP-Sprinkler Rough-in | 4/24/2017 | 4/25/2017 | 4/25/2017 | A | FAIL |
Troy Cobbley
|
|
|
Need as-builts submitted to plan review, need sheet rock removed to perform inspection, need small documents/notes/data sheets, need siesmic bracing installed
|
Sprinkler Plan Check | 3/7/2017 | | 3/7/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/7/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 3/7/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/7/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/7/2017 | | 3/7/2017 | | DONE |
Brittany Hill
|
|
|
|
Intake Approval | | | 3/6/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 3/6/2017 | | 3/6/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/6/2017 | | 3/6/2017 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 3/6/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 3/6/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 2/24/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 24 2017 11:25AM
|