Permit Information
Permit NumberFIR17-00107
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 6051 W EMERALD ST
Project NameSt. Als Emerald
Customer NumberUDG ONLY
ePlanReviewYes
Description
[Saint Alphonsus Medical Group - Udg Only] - Quick Permit
This is an underground fire sprinkler project for St. Als in Boise. Shilo's contract will start at the property line with a connection to an existing 6" water line, which connects to a 10" circulating water main. Shilo is responsible for excavation, bedding of the approximately 140 linear feet of 6" C900, and backfill.

[BLD16-04253] - The fire sprinkler system is used for code trade-offs including allowing a non-rated corridor and for fire flow. To construct a 12,803 square foot medical office building (outpatient clinic) and to finish it for occupancy. Work is to include concrete footings, concrete stem walls, concrete piers, concrete slab on grade, steel bearings studs, light gauge steel headers, steel stud shear walls with wood structural panels and hold-downs, steel stud nonbearing walls, steel stud exterior walls with drainable exterior insulation and finish system (EIFS), adhered stone masonry exterior veneer, exterior windows, permanent metal shade awnings at exterior windows, steel roof beams, steel columns, open web steel roof joists, steel pan deck roof diaphragm, foam plastic insulation installed on top of the steel roof deck, TPO roofing membrane, 6 restrooms accessible to the disabled, interior doors, millwork, and finishes. Special Inspection is required for soils, concrete, steel, bolting, welding, and possibly EIFS. The design for the open web steel roof joists is a deferred submittal item. The work is required to comply with the approved drawings, with the approved structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. The installation and use of X-ray equipment, including shielding, is required to comply with all applicable Industry, State, and Federal regulations. All equipment shall be listed and labeled per the adopted Electrical Code with approval from the PDS Electrical Inspection Team. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/20/201710/24/201710/24/2017PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in/Hydro6/29/20176/30/20176/30/2017PPASS
DetailsJim Page
Hydrostatic test for underground supply complete.
INSP-Supply line flush6/29/20176/30/20176/30/2017ADONE
DetailsJim Page
Underground main line flush complete
INSP-Sprinkler Rough-in5/26/20175/30/20175/30/2017APASS
DetailsTroy Cobbley
The thrust blocks have been poured. Underground supply piping can be covered.
INSP-Sprinkler Rough-in5/25/20175/26/20175/26/2017APART
DetailsTroy Cobbley
The remaining underground supply line is ok to cover except the four portions of piping where there are thrust blocks. These can not be covered since the concrete truck has not shown up yet. A re-inspection will be needed to verify thrust blocks
INSP-Sprinkler Rough-in5/3/20175/4/20175/4/2017APASS
DetailsTroy Cobbley
Todays inspection was for the 5' stub out only which is approved for cover
Intake Approval  3/7/2017 PASS
Plan assigned to (Tim)3/7/2017 3/7/2017 DONE
DetailsTim Frost
Sprinkler Plan Check3/7/2017 3/7/2017 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  3/7/2017 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  3/7/2017 DONE
DetailsTim Frost
Permit Ready to Issue  3/7/2017 DONE
Issue and Print Permit  3/7/2017 DONE
Inspection Record Card- Fire3/7/2017 3/7/2017 DONE
DetailsChristina Prado
Application received  3/3/2017 DONE
Application submitted via PDS Online on Mar 3 2017 3:27PM