INSP-Final Inspection | 7/18/2017 | 7/19/2017 | 7/19/2017 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in | 4/11/2017 | 4/12/2017 | 4/12/2017 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover.
|
INSP-Sprinkler Rough-in | 4/7/2017 | 4/7/2017 | 4/7/2017 | P | FAIL |
Troy Cobbley
|
|
|
It appears that cold air will be able to access the space under the second floor through the small garage area. Pictures of the area of concern were sent to Don.
|
INSP-Sprinkler Rough-in | 4/5/2017 | 4/5/2017 | 4/5/2017 | P | CANC |
Jim Page
|
|
|
Ok to cover // Don Phone #: ###-####-Don called and said he needed to cancel this inspection
|
INSP-Sprinkler Rough-in | 3/31/2017 | 3/31/2017 | 3/31/2017 | A | PART |
Jim Page
|
|
|
Rough in inspection is complete, piping cannot be covered until tenting inspection is complete.
|
Sprinkler Plan Check | 3/22/2017 | | 3/22/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/22/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 3/22/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/22/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/22/2017 | | 3/22/2017 | | DONE |
Brittany Hill
|
|
|
|
Intake Approval | | | 3/9/2017 | | FAIL |
|
|
|
|
Plan assigned to (Tim) | 3/9/2017 | | 3/9/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/9/2017 | | 3/9/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 3/9/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 3/7/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 7 2017 11:59AM
|