Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR17-00113
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 150 N CAPITOL BLVD
Project NameBoise City Hall PDS T.I.
Customer Number 
ePlanReviewYes
Description
[Boise City Hall - PDS 2nd Floor] - Quick Permit
Add, plug and relocate sprinklers in two locations to accommodate new wall and ceiling configuration.

[BLD16-04266] - Remodel of 3,367 SF in existing PDS department on 2nd floor of City Hall in 3 areas, Building 1. ALt #1 removed from scope of project as noted on drawings. Scope of work to include a new break room, conference and lactation room. Interior finishes, non bearing non combustible partition walls, mechanical, plumbing, and electrical work to be included. Occupant load of assembly area shall be posted. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/14/20176/15/20176/15/2017PPASS
DetailsJim Page
Final fire sprinkler inspection passed/complete
INSP-Sprinkler Rough-in3/20/20173/21/20173/21/2017PPASS
DetailsKatie Marron
Rough in completed satisfactory.
INSP-Sprinkler Rough-in3/20/20173/21/20173/20/2017ACANC
DetailsTroy Cobbley
Contact will be Leroy Anderson - please contact Leroy 30 min prior to inspection

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
INSP-Sprinkler Rough-in3/20/20173/21/20173/20/2017ACANC
DetailsJim Page
Contact will be Ken Orahood please call him 30 min before inspection starts.

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
Sprinkler Plan Check3/13/2017 3/13/2017 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  3/13/2017 DONE
DetailsTim Frost
Permit Ready to Issue  3/13/2017 DONE
all requirments met
Issue and Print Permit  3/13/2017 DONE
Inspection Record Card- Fire3/13/2017 3/13/2017 DONE
DetailsCarlos Velazquez
Intake Approval  3/8/2017 PASS
Plan assigned to (Tim)3/8/2017 3/8/2017 DONE
DetailsTim Frost
Sprinkler Plan Check3/8/2017 3/8/2017 FAIL
DetailsTim Frost
1st review completed  3/8/2017 FAIL
DetailsTim Frost
Miscellaneous action  3/8/2017 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Application received  3/7/2017 DONE
Application submitted via PDS Online on Mar 7 2017 12:02PM