Permit Information
Permit NumberFIR17-00114
StatusFinaled
Name FIRE SENTRY SYSTEMS
Site Address 850 W FRONT ST
Project NameBoise Centre Phase III
Customer Number 
ePlanReviewYes
Description
Add SLC devices to existing circuits 1 an 2. Includes Smoke, Heat, Sprinkler flow, tamper, and pressure monitoring. HVAC monitoring and shutdown. Elevator Shaft Monitoring. A notification speakers and stobes to existing NAC Panel F and add New NAC Panel G. Add New Audio Amp #5. Restore previously programmed, required smoke control sequence for entire building. Associated with building permit BLD16-04536.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/23/201710/26/201710/26/2017APASS
DetailsTroy Cobbley
Permit finaled. Supervisory signals were verified by Lee at all three buildings today.
INSP-Final Inspection10/23/201710/24/201710/23/2017ACANC
DetailsJim Page
Rafael Castillo w/ Lea Electric will be onsite for inspection Phone #: ###-#### >> Inspection requested via web by John Siewert Inspection cancelled from web by: John Siewert
INSP-Final Inspection9/6/20179/7/20179/7/2017APART
DetailsJim Page
Final fire alarm inspection partially complete, need to verify requirements with the fire alarm plan reviewer for audio/visual notification on the link between the grove hotel, century link arena as well as the district building.
INSP-Final Inspection9/5/20179/6/20179/6/2017PCANC
DetailsJim Page
Inspection request will be rescheduled due to issues with a NAC panel, this inspection request is cancelled.
INSP-Final Inspection9/5/20179/6/20179/6/2017ACANC
DetailsJim Page
John Phone #: ###-####
INSP-Final Inspection8/31/20179/5/20179/5/2017PCANC
DetailsJim Page
Tech - Kc Strykowski

Consolidated with FIR16-00777 and FIR17-00340 Phone #: ###-#### >> Inspection requested via web by John Siewert Inspection cancelled from web by: John Siewert
CHANGE STATUS TO (REV)  8/30/2017 DONE
Alarm Plan Check8/30/2017 8/30/2017 PASS
DetailsLee G Meredith
PLANS TAKEN FRONT DESK ALARM  8/30/2017 DONE
Plan modification approved. No additional review comments.
Permit Ready to Issue  8/30/2017 DONE
CHANGE STATUS TO (ISS)  8/30/2017 DONE
(F) Reprint permit  8/30/2017 DONE
Plan Modification Accepted  8/29/2017 DONE
Miscellaneous action  8/22/2017 DONE
eplanreview workflow opened for a plan modification at John Siewert's request.
INSP-Final Inspection8/15/20178/16/20178/16/2017PFAIL
DetailsTroy Cobbley
No city approved plans on site. No inspection performed. As previously stated plans need to be re-submitted and smoke evac zones need tested.
INSP-Final Inspection7/14/20177/17/20177/17/2017PCANC
DetailsJim Page
Inspection of signals to neighboring buildings. Phone #: ###-#### >> Inspection requested via web by Chris Siewert Inspection cancelled from web by: Chris Siewert
INSP-Final Inspection6/29/20176/30/20176/30/2017PPART
DetailsTroy Cobbley
Temp c of o, phase 3 fire alarm is complete. Fire alarm plans need to be resubmitted for a plan mod due to changes
INSP-Final Inspection3/29/20173/30/20173/30/2017APART
DetailsJim Page
Partial final complete for fire alarm system. Area's inspected consist of link between GBAD, Century Link and Boise Center, audio visual devices tested good as well as escalator lobbies on level 1 and level 2. Area's requested for TCO passed/complete (GBAD, Century Link, Boise Center and elevated concourse between Boise Center and west stairwell)
INSP-Final Inspection3/29/20173/29/20173/29/2017PCANC
DetailsJim Page
Scheduled for 30MAR2017
Permit Ready to Issue  3/27/2017 DONE
all requirements met
Issue and Print Permit  3/27/2017 DONE
Inspection Record Card- Fire3/27/2017 3/27/2017 DONE
DetailsCarlos Velazquez
Telephone call  3/24/2017 DONE
Called Jim to let him know that the floor plans for FA3 abd FA4 are pre-demo plans and that the as built drawings will be required to be updated with the new floor plans prior to acceptance.
Alarm Plan Check3/24/2017 3/24/2017 PASS
DetailsLee G Meredith
PLANS TAKEN FRONT DESK ALARM  3/24/2017 DONE
Plans approved with review comments and specific requirements.
Plan resubmittals received  3/23/2017 DONE
Miscellaneous action  3/23/2017 DONE
Scale graph appears to be incorrect on sheet 17-033-FA5. I emailed Jim regarding my concerns and asked him to verify their accuracy.
Miscellaneous action  3/22/2017 DONE
Jim Shilton emailed to inform me that he had forgotten to add elevator recall to the sequence matrix. I replyed to ask him to make the changes and email the revised drawing so it could be inserted.
Telephone call  3/21/2017 DONE
Spoke with Jamie Koenig of ZGA Architects. I explained the smoke control requirements and the need to determine how the floor plan changes affect the existing system. He looked into it with the mechanical engineer of record and determined what was required. He issued a letter explaining this and made it a requirement of the project. The letter has been uploaded into the Tidemark documents.
Plan resubmittals received  3/21/2017 DONE
Plan assigned to (Lee)3/8/2017 3/8/2017 DONE
DetailsLee G Meredith
1st review completed  3/8/2017 FAIL
Failed pre-screen review. No smoke control zones shown, no smoke control operations indicated on matrix, magnetic door holders not shown. Emailed Jim Shilton informing him that this information is needed prior to review and if needed, the records department has archives of the previous retro-fit that shows the smoke control zones and sequence.
Telephone call  3/8/2017 DONE
Jim called to say he did not have access to any of the smoke control zone layout or programming information. Subsequently, I was able to find the information in PDS records and forwarded it to him via email. I informed him that zone modifications are required to be reviewed and approved by the mechanical engineer of record.
Application received  3/7/2017 DONE
Application submitted via PDS Online on Mar 7 2017 9:50PM