INSP-Final Inspection | 6/1/2017 | 6/1/2017 | 6/1/2017 | P | PASS |
Jim Page
|
|
|
Final underground inspection passed/complete
|
INSP-Supply line flush | 5/31/2017 | 5/31/2017 | 5/31/2017 | P | PASS |
Troy Cobbley
|
|
|
Under ground supply line flush passed
|
INSP-Sprinkler Rough-in/Hydro | 5/30/2017 | 5/30/2017 | 5/30/2017 | P | PASS |
Troy Cobbley
|
|
|
Under ground hydro test passed
|
INSP-Sprinkler Rough-in/Hydro | 5/19/2017 | 5/19/2017 | 5/19/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
|
INSP-Sprinkler Rough-in | 5/17/2017 | 5/17/2017 | 5/17/2017 | P | PART |
Jim Page
|
|
|
Partial rough to cover inspection complete for the underground supply, straight sections of pipe approved for cover, all thrust blocks at changes of direction will be poured and inspected at a later date.
|
Plan Modification Accepted | | | 5/1/2017 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 5/1/2017 | | 5/1/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/1/2017 | | 5/1/2017 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/1/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/1/2017 | | DONE |
|
|
|
|
Intake Approval | | | 3/14/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 3/14/2017 | | 3/14/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/14/2017 | | 3/14/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 3/14/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 3/14/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/14/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/14/2017 | | 3/14/2017 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | | 3/13/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 13 2017 3:07PM
|