Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR17-00173
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 1825 N MOCKBEE PL
Project NameShriner Residence
Customer Number 
ePlanReviewYes
Description
[Shriner Residence]
The fire sprinkler scope of work consists of protecting a three level single family dwelling with a NFPA 13D system. The system has a combination water service. The fire protection system is designed as a passive purge type system. The domestic is designed to shut down when the fire protection system activates.

[BLD17-00341] - WUI Zone A; **Fire sprinklers are required. A separate permit is required for fire sprinklers prior to beginning installation work. **Special inspection is required for structural steel, see Statement of Special Inspections** Permit for the construction of a new 2607 sq. ft., three-level (entry level 205 sq. ft., main level 1695 sq. ft., upper level 707 sq. ft.) single family dwelling with 3 bedrooms, 3.5 bathrooms, and a 595 sq. ft. attached garage per the approved plans, engineering, ACCA report and any notations. R-1B zoning and setbacks per planning. //leg
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/25/20181/26/20181/26/2018APASS
DetailsJim Page
Final fire sprinkler inspection complete.
INSP-Final Inspection1/23/20181/23/20181/23/2018PPART
DetailsJim Page
Partial final inspection complete for overhead fire sprinklers. Irrigation needs to isolate when flow switch activates, permit cannot be finaled until irrigation isolation on flow switch activation is verified.
INSP-Final Inspection1/16/20181/18/20181/17/2018ACANC
DetailsTroy Cobbley
Probably won’t be ready until 10:00 am Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
INSP-Final Inspection1/8/20181/8/20181/8/2018PCANC
DetailsJim Page
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
INSP-Sprinkler Rough-in8/7/20178/9/20178/9/2017APART
DetailsJim Page
Tenting inspection complete, insulating contractor needs to provide documentation for the foam blow in insulation for compatibility with CPVC, cover is approved at builders discretion based on compatability report, if blow in insulation is not compatible then foam covered fire sprinkler piping will need to be replaced.
INSP-Sprinkler Rough-in8/4/20178/7/20178/7/2017APART
DetailsJim Page
Rough in inspection complete for overhead fire sprinkler piping/pendant heads. Area's between conditioned living spaces approved for cover, all other piping requires tenting, piping not between conditioned spaces cannot be covered until tenting inspection is complete.
Sprinkler Plan Check4/13/2017 4/13/2017 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  4/13/2017 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  4/13/2017 DONE
DetailsTim Frost
Permit Ready to Issue  4/13/2017 DONE
all requirements met
Issue and Print Permit  4/13/2017 DONE
Inspection Record Card- Fire4/13/2017 4/13/2017 DONE
DetailsCarlos Velazquez
Intake Approval  4/12/2017 PASS
Plan assigned to (Tim)4/12/2017 4/12/2017 DONE
DetailsTim Frost
Application received  4/11/2017 DONE
Application submitted via PDS Online on Apr 11 2017 2:46PM