INSP-Final Inspection | 7/30/2020 | 7/31/2020 | 7/31/2020 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection is complete.
Screened- Dillon Phone #: ###-####
|
INSP-Final Inspection | 5/20/2020 | 5/21/2020 | 5/21/2020 | A | PART |
Jim Page
|
|
|
Final fire alarm inspection for pyrophoric building is complete, fire alarm permit covers entire B51 building to include pyrophonic building, fire alarm permit will remain in issued status until entire FIR permit scope is inspected.
Dillin *screened* Phone #: ###-####
|
Fees Due Hold | 4/25/2020 | | 5/20/2020 | | DONE |
Tiffany Carson-Herker
|
|
|
|
INSP-Alarm Testing | 4/27/2020 | 4/27/2020 | 4/27/2020 | P | DONE |
Troy Cobbley
|
|
|
I helped Jim Page out on this inspection. Please see the city approved plans for corrections notated.
|
INSP-Alarm Testing | 4/24/2020 | 4/27/2020 | 4/27/2020 | A | PART |
Jim Page
|
|
|
Fire alarm walkthrough partially complete, city approved plans have been notated for areas to correct.
screened // Dillon Phone #: ###-####
|
INSP-Alarm Testing | 4/23/2020 | 4/24/2020 | 4/24/2020 | A | PART |
Jim Page
|
|
|
Fire alarm walkthrough partially complete, city approved plans have been notated for areas to correct.
*screened* Dillon Phone #: ###-####
|
INSP-Alarm Testing | 4/22/2020 | 4/23/2020 | 4/23/2020 | A | PART |
Jim Page
|
|
|
Walk through for level 3 complete, notated city approved drawings areas needing correction, 4 areas total for level 3.
dillon Phone #: ###-####
|
Permit Ready to Issue | | | 3/25/2020 | | DONE |
|
|
|
as built approved
|
CHANGE STATUS TO (ISS) | | | 3/25/2020 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 3/2/2020 | | 3/24/2020 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 3/24/2020 | | DONE |
|
|
|
|
Alarm Plan Check | 3/24/2020 | | 3/24/2020 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/24/2020 | | DONE |
|
|
|
As built # 2. Minimum $65 review fee due.
|
Plan resubmittals received | | | 3/2/2020 | | DONE |
|
|
|
|
INSP-Final Inspection | 1/10/2020 | 1/13/2020 | 1/13/2020 | A | FAIL |
Jim Page
|
|
|
Overspaced audio visual devices in electrical room area, section 10 area 90. Notated city approved draiwngs areas where candella setting was incorrect, inspection was stopped after 6 deficiencies.
Dillion Phone #: ###-####
|
INSP-Final Inspection | 1/8/2020 | 1/10/2020 | 1/10/2020 | A | CANC |
Jim Page
|
|
|
Coordinated for 13JAN2020, cancelled due to inspection load and time required for this inspection.
Dillion Phone #: ###-####
|
INSP-Final Inspection | 12/19/2019 | 12/20/2019 | 12/20/2019 | P | PART |
Jim Page
|
|
|
FIre alarm inspection for TCUP is complete, fire alarm system in TCUP is compliant with NFPA 72, Due to this system being included in the B51 plans, Fire Alarm Plan Examiner still needs to perform review, per conversation with Joe Bruce, Fire Section Supervisor, if fire alarm system is compliant with NFPA 72 then life fire safety inspection can be performed due to the TCUP being included on the B51 drawings. Will verify that install matches submittal during B51 inspection.
.tea cup // Dillon Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 12/19/2019 | | DONE |
|
|
|
as built- no fee per Lee
|
Plan assigned to (Lee) | 12/4/2019 | | 12/18/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 12/18/2019 | | DONE |
|
|
|
|
Alarm Plan Check | 12/18/2019 | | 12/18/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 12/18/2019 | | DONE |
|
|
|
As built. No Fee.
|
Plan Modification Accepted | | | 12/4/2019 | | DONE |
|
|
|
as built
|
INSP-Alarm Testing | 10/22/2019 | 10/22/2019 | 10/22/2019 | A | FAIL |
Jim Page
|
|
|
Started inspection in level 10, section 90 of the city approved drawings, notated 7 areas that need corrected where candella settings due not match what was submitted as well as a/v devices that have been added that are not on city approved drawings, inspection stopped due to defecincies noted.
Requesting for 10/22 AM
|
INSP-Alarm Testing | 10/21/2019 | 10/21/2019 | 10/21/2019 | P | CANC |
Troy Cobbley
|
|
|
To be rescheduled per paul ###-####
|
INSP-Final Inspection | 10/8/2019 | 10/9/2019 | 10/9/2019 | A | CANC |
Jim Page
|
|
|
Dillon Phone #: ###-####
|
INSP-Alarm Testing | 11/7/2017 | 11/8/2017 | 11/8/2017 | P | PART |
Jim Page
|
|
|
Fire alarm testing/inspection for TCUP building complete.
|
INSP-Conference | 10/23/2017 | 10/23/2017 | 10/23/2017 | P | DONE |
Jim Page
|
|
|
Discuss requirements for passenger elevator control room/and shaft. Currently the elevator controller is in the shaft space. There are no walls or hard lid that separate the controller and the shaft. Top of the shaft is 60ft above controller. Device maintenance is a concern. Tribal Fire also questions the location of the sprinkler heads needed.
Issue is deferred to fire alarm system design and plan review to provide a solution.
|
INSP-Alarm Testing | 10/10/2017 | 10/11/2017 | 10/11/2017 | A | DONE |
Jim Page
|
|
|
Audio visual notification for Building 51.2 sections complete. Fire riser monitoring for area's associated with building 51.2 complete.
|
INSP-Alarm Testing | 7/11/2017 | 7/12/2017 | 7/12/2017 | P | DONE |
Jim Page
|
|
|
Alarm testing for deluge system associated with this permit complete.
|
INSP-Alarm Testing | 6/29/2017 | 6/30/2017 | 6/30/2017 | P | PART |
Jim Page
|
|
|
Fire alarm testing for fire sprinkler risers protecting TCO requested area complete, audio visual device testing for TCO requested area complete to include clean room area.
|
INSP-Alarm Testing | 6/27/2017 | 6/29/2017 | 6/29/2017 | P | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with Toby Phone #: ###-#### Inspection requested will be rescheduled.
|
Meeting | | | 6/8/2017 | | DONE |
|
|
|
Met on site with Paul, Ron Johnson and several contractors involved in the project to discuss control requirements of the B50 and B51 link deluge systems. It was agreed that current code requiring listed releasing components and supervised service disconnects will be used.
|
Alarm Plan Check | 6/8/2017 | | 6/8/2017 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 6/8/2017 | | DONE |
|
|
|
Plans approved, as noted, with review comments and requirements.
|
Permit Ready to Issue | | | 6/8/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/8/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 6/8/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/8/2017 | | 6/8/2017 | | DONE |
Christina Prado
|
|
|
|
Miscellaneous action | | | 6/5/2017 | | DONE |
|
|
|
Voltage drop and battery calcs received. Numerous errors found.
|
Telephone call | | | 6/2/2017 | | DONE |
|
|
|
Discussed calculation errors with Paul Marcolina. He will have Curtis call to discuss how they would like to proceed.
|
Plan resubmittals received | | | 5/25/2017 | | DONE |
|
|
|
|
Miscellaneous action | | | 5/25/2017 | | DONE |
|
|
|
Updated notification voltage drop calculations missing. Emailed Paul and asked him to send at his convenience.
|
Miscellaneous action | | | 5/19/2017 | | DONE |
|
|
|
Paul appears to have uploaded the resubmittal into FIR17-00221. (Modular Office project). Informed him via email to verify and make corrections.
|
Miscellaneous action | | | 4/21/2017 | | DONE |
|
|
|
Dan Krishnek of Power Plus Electric (fire alarm installing contractor) emailed requesting copies of the floor plan mark ups for corrections. I informed him that Paul Marcolina should be able to provide these, since he is the applicant.
|
Telephone call | | | 4/20/2017 | | DONE |
|
|
|
Paul Marcolina called to indicate he was having problems accessing the drawings with mark ups. I had him call Rita for assistance.
|
Miscellaneous action | | | 4/19/2017 | | DONE |
|
|
|
1st review comments sent to Paul Marcolina.
|
Application received | | | 4/14/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 14 2017 12:01PM
|
Plan assigned to (Lee) | 4/14/2017 | | 4/14/2017 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 4/14/2017 | | FAIL |
|
|
|
See review comments
|