Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR17-00203
StatusFinaled
Name AMERICAN FIRE PROTECTION LLC
Site Address 680 E BOISE AVE
Project NameHastings Demo
Customer Number 
ePlanReviewYes
Description
[Hastings Demo] - Quick Permit
Remove all pendant sprinklers from existing system. Leave existing upright sprinklers in place and in service. System will be left in service each night throughout the project (all ceilings are being removed). This is a 37,000 sf. building with a full wet sprinkler system at the roof deck.

[BLD17-00330] - The fire sprinkler system is used for building area increase. To complete interior nonstructural demolition within an existing 35,696 square foot building. Work is to include removing a small mezzanine and the stairway that serves it, interior nonstructural partitions, interior doors, a tenant demising wall, point of sale casework, display casework, plumbing fixtures, and floor finishes in preparation for a new tenant. The suspended acoustical ceiling and the fire sprinkler system will be retained. Tenant improvement work will be done under a separate permit. No new work is allowed under this permit. This permit does not establish a Certificate of Occupancy for any tenant or for any portion of this building. The fire sprinkler system is required to be maintained in compliance with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/13/201710/16/201710/16/2017PPASS
DetailsJim Page
Demo permit for this scope of work complete.
Permit Ready to Issue  5/1/2017 DONE
all requirements met
Issue and Print Permit  5/1/2017 DONE
Inspection Record Card- Fire5/1/2017 5/1/2017 DONE
DetailsCarlos Velazquez
Inspection Record Card- Fire5/1/2017 5/1/2017 DONE
DetailsCandy A. Nichols
Application received  4/28/2017 DONE
Application submitted via PDS Online on Apr 28 2017 11:22AM
Intake Approval  4/28/2017 PASS
Plan assigned to (Tim)4/28/2017 4/28/2017 DONE
DetailsTim Frost
Sprinkler Plan Check4/28/2017 4/28/2017 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  4/28/2017 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  4/28/2017 DONE
DetailsTim Frost