Permit Information
Permit NumberFIR17-00205
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 7530 W STATE ST
Project NameBLACK BEAR DINER SHELL
Customer Number 
ePlanReviewYes
Description
[Black Bear Diner - Shell]
The fire sprinkler scope of work consists of installing a complete automatic wet pipe fire sprinkler system throughout the new shell building per NFPA 13 2013 for ordinary hazard I. The system has 6” underground to a 3” backflow preventer and riser. The system is designed as a 2½”x2”x1½” Grid supplied by a 2½” Feed Main. Additional pipe and fittings have been added to the calculations for a later tenant improvement. Quick response sprinklers are being utilized. The building is wood truss construction. All combustible concealed spaces are to be filled with noncombustible insulation as per the drawing.

[BLD17-00012] – For the construction of a new 5,504 sq. ft. shell building on and existing pad site with work to include general site work with utilities. This building will be fire sprinklered to accommodate the future A-2 occupancy. A separate building permit is required to complete the build out of the tenant space. The building envelope including the HVAC units and exterior lighting have been reviewed under this permit with interior lighting selected as the additional energy efficiency option. The interior lighting will be reviewed as part of the future tenant improvement. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/2/201711/3/201711/3/2017APASS
DetailsTroy Cobbley
Permit finaled

Rick Phone #: ###-####
INSP-Final Inspection10/26/201710/27/201710/27/2017ACANC
DetailsTroy Cobbley
Not ready for final due to the project related fire alarm not being ready.
INSP-Sprinkler Rough-in/Hydro6/12/20176/12/20176/12/2017PPASS
DetailsJim Page
Overhead fire sprinkler hydrostatic test complete.
INSP-Sprinkler Rough-in6/9/20176/9/20176/9/2017PPASS
DetailsJim Page
Rough in inspection for overhead fire sprinkler piping core and shell protection complete.
Intake Approval  5/2/2017 PASS
Plan assigned to (Tim)5/2/2017 5/2/2017 DONE
DetailsTim Frost
Sprinkler Plan Check5/2/2017 5/2/2017 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  5/2/2017 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  5/2/2017 DONE
DetailsTim Frost
Permit Ready to Issue  5/2/2017 DONE
Issue and Print Permit  5/2/2017 DONE
Inspection Record Card- Fire5/2/2017 5/2/2017 DONE
DetailsBrittany Hill
Application received  5/1/2017 DONE
Application submitted via PDS Online on May 1 2017 2:41PM