INSP-Sprinkler Rough-in | 2/9/2018 | 2/9/2018 | 2/9/2018 | P | PASS |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler pipig complete, sway bracing on main in middle part of building exceeds length for piping installed, piping will need to upsized to be compliant. Verfication of sway brace repair will be made at final inspection.
|
INSP-Sprinkler Rough-in/Hydro | 2/8/2018 | 2/9/2018 | 2/9/2018 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure observed at contractor provided gauge at riser location.
|
INSP-Sprinkler Rough-in/Hydro | 2/7/2018 | 2/8/2018 | 2/8/2018 | A | FAIL |
Jim Page
|
|
|
Visible leaks on level 2 and level 1, overhead hydro will need to be retested after leaks are repaired.
|
INSP-Conference | 1/17/2018 | 1/19/2018 | 1/19/2018 | A | DONE |
Jim Page
|
|
|
Fire conference complete.
|
CHANGE STATUS TO (ISS) | | | 12/4/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/4/2017 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/1/2017 | | 12/1/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/1/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 12/1/2017 | | DONE |
|
|
|
DO NOT RE ISSUE PLAN MOD
|
Plan Modification Accepted | | | 11/27/2017 | | FAIL |
|
|
|
|
Sprinkler Plan Check | 11/27/2017 | | 11/27/2017 | | FAIL |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 11/27/2017 | | 11/27/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/13/2017 | | 6/13/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/13/2017 | | DONE |
Tim Frost
|
|
|
|
Issue and Print Permit | | | 6/13/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/13/2017 | | 6/13/2017 | | DONE |
Tisha Gallop
|
|
|
|
Sprinkler Plan Check | 6/8/2017 | | 6/8/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 6/8/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Sprinkler Plan Check | 5/23/2017 | | 5/23/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 5/23/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 5/15/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 5/15/2017 | | 5/15/2017 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 5/15/2017 | | DONE |
|
|
|
I sent email to the owner, informing him the storage will be limited to 12' based on the fire protection design criteria even though the building has a 24' clear height.
|
Sprinkler Plan Check | 5/15/2017 | | 5/15/2017 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 5/15/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 5/15/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 5/12/2017 | | DONE |
|
|
|
Application submitted via PDS Online on May 12 2017 10:53AM
|