INSP-Final Inspection | 1/10/2018 | 1/16/2018 | 1/16/2018 | A | PASS |
Jim Page
|
|
|
Final underground inspection complete, notes for hydro and flush on underground supply were scheduled and inputted under overhead FIR permit, FIR17-00212
|
INSP-Sprinkler Rough-in | 8/25/2017 | 8/25/2017 | 8/25/2017 | A | PASS |
Troy Cobbley
|
|
|
Inspection for remaining underground to property line passed. Piping can be covered.
|
INSP-Sprinkler Rough-in | 5/16/2017 | 5/16/2017 | 5/16/2017 | P | PART |
Jim Page
|
|
|
Partial rough to cover inspection complete for underground supply, In building riser, pipe between IBR, change of direction heading towards the east an approximately 12 feet of pipe approved for cover.
|
Intake Approval | | | 5/16/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 5/16/2017 | | 5/16/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/16/2017 | | 5/16/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 5/16/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/16/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 5/16/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/16/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/16/2017 | | 5/16/2017 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 5/15/2017 | | DONE |
|
|
|
Application submitted via PDS Online on May 15 2017 11:15AM
|