INSP-Final Inspection | 4/23/2018 | 4/26/2018 | 4/26/2018 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection complete.
|
INSP-Final Inspection | 4/23/2018 | 4/24/2018 | 4/24/2018 | A | CANC |
Jim Page
|
|
|
Landon Phone #: ###-####
|
INSP-Final Inspection | 4/23/2018 | 4/23/2018 | 4/23/2018 | P | FAIL |
Jim Page
|
|
|
Provide map at main final panel showing devices for all buildings. Provide document cabinet at main fire panel. Troubleshoot issue for audio visual notification, no A/V's operated when flow switch was activated. FDC bell did not ring on water flow with dry system.
|
Alarm Plan Check | 8/31/2017 | | 8/31/2017 | | PASS |
Lee G Meredith
|
|
|
Plans approved, as noted, with review comments and requirements.
|
PLANS TAKEN FRONT DESK ALARM | | | 8/31/2017 | | DONE |
|
|
|
Plans approved with review comments and requirements.
|
Permit Ready to Issue | | | 8/31/2017 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 8/31/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/31/2017 | | 8/31/2017 | | DONE |
Tiffany Carson-Herker
|
|
|
|
Miscellaneous action | | | 8/30/2017 | | DONE |
|
|
|
Revised calculations received.
|
Miscellaneous action | | | 8/28/2017 | | DONE |
|
|
|
Emailed Cindy to let her know that the latest drawing 22 still does not match the other calculation drawings. I provided sided by side drawings showing some of the calculation errors and firmly informed them that they need to go through all drawings and calculation sheets and provide corrections.
|
Miscellaneous action | | | 8/25/2017 | | DONE |
|
|
|
Received an updated drawing 22 via email.
|
Miscellaneous action | | | 8/23/2017 | | DONE |
|
|
|
Emailed Cindy to remind her that I am still waiting on corrected calculations.
|
Miscellaneous action | | | 8/17/2017 | | DONE |
|
|
|
Updated calculations received for sheets 22 - 26. Numbers on sheet ww are incorrect. Emailed Cindy requesting corrections.
|
Miscellaneous action | | | 8/14/2017 | | DONE |
|
|
|
Emailed Cindy to let her know that her circuit and panel calculations do not appear to have been updated to show chnages made on this resubmittal. Requested updates be provided.
|
1st review completed | | | 8/2/2017 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 7/31/2017 | | DONE |
|
|
|
|
Miscellaneous action | | | 7/31/2017 | | DONE |
|
|
|
Engineer of record approval was not included. I emailed Cindy to let her know that our review cannot be completed without it and asked her to email it to me as soon as she receives it.
8/2/17 Engineer of Record approval received and inserted ito project.
|
Miscellaneous action | | | 6/6/2017 | | DONE |
|
|
|
Cindy Barnes finally submitted printed drawings for the building and the two other buildings at this site under a new tidemark permit (FIR17-00256). I contacted her on the phone and informed her that each building needed to be submitted for seperate permits. I also informed her of various design items that needed correction prior to resubmittal. She will upload to the correct projects in eplanreview. (FIR17-00232, 00233 & 00234). FIR17-00256 is to be voided.
|
Telephone call | | | 5/16/2017 | | DONE |
|
|
|
Called Ken Chapman since application had been received but no drawings or documents had been uploaded to eplan review. He directed me to Gary powers. Gary informed me that their records showed the submittal was done in late December of 2016. I let hime know I didn't receive anything until 5-16-17. He coordinated with Cindy Barns who is to get files uploaded into eplanreview.
|
Application received | | | 5/15/2017 | | DONE |
|
|
|
Application submitted via PDS Online on May 15 2017 1:52PM
|