INSP-Final Inspection | 6/28/2017 | 6/28/2017 | 6/28/2017 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 5/18/2017 | 5/18/2017 | 5/18/2017 | P | PART |
Troy Cobbley
|
|
|
A temporary is being given with Scott's permission until the FIR is submitted/issued/tested for the hood suppression interconnection with the existing fire alarm system. Today I verified that the hood suppression shut down the gas and electrical.
|
INSP-Final Inspection | 5/15/2017 | 5/17/2017 | 5/17/2017 | P | CANC |
Troy Cobbley
|
|
|
No inspection performed. Need to wait until a FIR permit has been issued and an inspection scheduled for the interconnection of the hood suppression system to the existing riser monitoring system.
|
Issue permit | | | 5/15/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/15/2017 | | DONE |
|
|
|
This permit was created on the web by Don Kartchner
|