Permit NumberFIR17-00255
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 1000 E PARK BLVD
Project NamePark Medical Office Building
Customer Number 
ePlanReviewYes
Description
[Park Medical Office Building]
The fire sprinkler scope of work consists core and shell for a new single level, 27,634 ft² medical office building. It will have a new 6" C-900 underground supplying a 4" backflow and riser to 223 standard spray, standard coverage sprinkler heads in a single wet system. There are large ducts throughout. The ducts greater than 4 feet have sprinkler coverage below.

• The underground piping is under permit FIR17-00208

[BLD16-04337]
(5-8-17 plan modification to revise the roof structure above the south tenant space to support an equipment enclosure on the roof. Work includes relocating or adding interior concrete footings; alterations to the columns, beams, and joists of the roof structure; placing a concrete mechanical pad on top of the roof deck; and constructing a roof top mechanical equipment screen wall.) To construct a 27,972 square foot medical office building that will likely have 2 tenants. Work is to include concrete footings, concrete stem walls (concrete slabs on grade will be placed under a future permit), steel columns, steel beams, open web steel roof joists, steel roof deck for flat roofs, prefinished metal roofing for sloping roofs, metal stud exterior walls, Sureboard Series 200 shearwall sheathing attached to metal studs, fiberglass mat sheathing on the exterior side of metal stud walls, rigid insulation installed on top of the flat roof decks, single ply roof membranes, primary roof drains and secondary roof drains, concrete roof slab within the rooftop mechanical equipment screen enclosure, rooftop mechanical equipment screen walls, Exterior Insulation and Finish System (EIFS), thin brick exterior veneer, fiber cement exterior siding, exterior windows, exterior doors, automatic sliding doors with break-outs, a suspended acoustical ceiling within the lobby, gypsum soffits within the lobby, and lobby finishes. A generator will be installed in conjunction with this permit. Special Inspection is required for soils, concrete, steel construction including welding and bolting, post installed mechanical concrete anchors, post installed epoxy concrete anchors, and perhaps EIFS. The design for the open web steel roof joists is a deferred submittal item. If this medical building will be used as an Ambulatory Care Facility where individuals are incapable of self-preservation, full compliance with 2012 IBC Section 422 is required to be shown under the future tenant improvement permit applications. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. This permit is NOT intended to establish a Certificate of Occupancy for any tenant. Separate tenant improvement permits are required to establish occupancy. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/19/201712/20/201712/19/2017APASS
DetailsJim Page
Final fire sprinkler inspection complete.
INSP-Sprinkler Rough-in12/19/201712/20/201712/19/2017APASS
DetailsJim Page
Rough in inspection complete.
INSP-Sprinkler Rough-in12/1/201712/1/201712/1/2017PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in lobby area complete, lobby area approved for cover.
INSP-Sprinkler Rough-in11/17/201711/17/201711/17/2017PPART
DetailsJim Page
Rough in inspection for overhead fire sprinkler piping complete. A rough to cover inspection will need to scheduled for finished heads before cover can be approved.
Sprinkler Plan Check5/30/2017 5/30/2017 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  5/30/2017 DONE
DetailsTim Frost
Permit Ready to Issue  5/30/2017 DONE
Issue and Print Permit  5/30/2017 DONE
Inspection Record Card- Fire5/30/2017 5/30/2017 DONE
DetailsCandy A. Nichols
Intake Approval  5/26/2017 PASS
Plan assigned to (Tim)5/26/2017 5/26/2017 DONE
DetailsTim Frost
Sprinkler Plan Check5/26/2017 5/26/2017 FAIL
DetailsTim Frost
1st review completed  5/26/2017 FAIL
DetailsTim Frost
Miscellaneous action  5/26/2017 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Application received  5/25/2017 DONE
Application submitted via PDS Online on May 25 2017 6:27AM