INSP-Final Inspection | 11/6/2017 | 11/6/2017 | 11/6/2017 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work passed/complete.
|
INSP-Sprinkler Rough-in | 11/6/2017 | 11/6/2017 | 11/6/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for area of work complete, area of work approved for cover.
|
INSP-Final Inspection | 11/2/2017 | 11/3/2017 | 11/3/2017 | A | FAIL |
Troy Cobbley
|
|
|
Called contact and left message on voice mail. Went to job and did not make contact. I noted that final inspections are scheduled but no rough-in inspection has been performed. Ceilings will need to be removed for verification of hangers and piping.
Mike Martin is requesting a final inspection for the 11th floor elevator lobby of US Bank. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
1st review completed | | | 5/26/2017 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 5/26/2017 | | 5/26/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/26/2017 | | 5/26/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 5/26/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/26/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 5/26/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/26/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/26/2017 | | 5/26/2017 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 5/25/2017 | | DONE |
|
|
|
Application submitted via PDS Online on May 25 2017 5:52PM
|