INSP-Final Inspection | 10/17/2017 | 10/17/2017 | 10/17/2017 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 9/26/2017 | 9/27/2017 | 9/27/2017 | A | PART |
Troy Cobbley
|
|
|
Not ready for final yet. To final project I need as-builts showing some of the walls deleted. or if the walls will be installed at least two pendant heads will be required at both ends of the short corridor at the south stair well. I spoke to Brad Bettencourt about this.
|
INSP-Sprinkler Rough-in | 8/31/2017 | 9/1/2017 | 9/1/2017 | A | PART |
Troy Cobbley
|
|
|
Sprinkler heads outside of new corridor system are ok to cover. One pendant needs to be added in the Storage Room as per plans.
|
Intake Approval | | | 5/30/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 5/30/2017 | | 5/30/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/30/2017 | | 5/30/2017 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 5/30/2017 | | FAIL |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/30/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 5/30/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/30/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/30/2017 | | 5/30/2017 | | DONE |
Brittany Hill
|
|
|
|
Application received | | | 5/26/2017 | | DONE |
|
|
|
Application submitted via PDS Online on May 26 2017 9:07AM
|