Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR17-00267
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 348 S 13TH ST
Project NameHilton Garden Inn - Boise
Customer Number 
ePlanReviewYes
Description
[Hilton Garden Inn]
The fire sprinkler scope of work consists of New 5 Story wood frame Type III-B Construction w/mixed occupancy's - separated uses. There are three standpipes. Each floor is gridded. The pipe sizes vary per floor. The first level has steel piping and the rest of the levels have CPVC piping.

• Underground is under Permit FIR17-00102
• This building is NOT considered a high-rise.
• A standpipe system IS required.

[BLD17-00583]
5 story wood framed 132-unit hotel building with the first story consisting of meeting, office, mechanical, storage, kitchen, pool and 4 sleeping rooms. The remaining four stories consist of sleeping rooms and associated accessory areas. All work per the approved plans and attached engineering. This building is fully fire sprinklered with a NFPA 13 system for area and height and has an alarm system.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/22/20186/25/20186/25/2018PPASS
DetailsJim Page
Final fire sprinkler inspection complete.

Contact Ken Orahood - 28-###-#### 30 min prior to Final Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
Plan Modification Accepted  6/22/2018 DONE
Plan assigned to (Tim)6/22/2018 6/22/2018 DONE
DetailsTim Frost
Sprinkler Plan Check6/22/2018 6/22/2018 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  6/22/2018 DONE
DetailsTim Frost
Permit Ready to Issue  6/22/2018 DONE
CHANGE STATUS TO (ISS)  6/22/2018 DONE
plan mod
INSP-Sprinkler Rough-in/Hydro6/18/20186/19/20186/19/2018ADONE
DetailsJim Page
Hydrostatic test for level 3 witnessed, no pressure loss observed at riser provided gauge.

Contact Ken Orahood -###-#### 30 Min prior to Hydro Insp on 3rd Floor Start please.

thank YOU. Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in/Hydro6/13/20186/14/20186/14/2018APART
DetailsJim Page
Hydrostatic test for levels 2, 4 and 5 witnessed, no pressure loss observed at riser provided gauges. Level 3 still needs hydro completed.

Contact Ken Orahood, ###-#### 30 min prior to Hyro Insp start on levels 2, 4, ; 5 please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in/Hydro6/13/20186/13/20186/13/2018PFAIL
DetailsJim Page
Levels 2, 4 and 5 lost pressure during hydrostatic test.
INSP-Sprinkler Rough-in/Hydro6/12/20186/13/20186/13/2018APART
DetailsJim Page
Hydrostatic test for standpipe witnessed, no pressure loss observed at contractor provided gauge.

Contact Ken Orahood ###-#### 30 min prior to Hydro Insp 2nd, 4th, 5th floors and stand pipe start.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in/Hydro6/12/20186/12/20186/12/2018PPART
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping on level 1 witnessed, no pressure loss observed at riser provided gauge. Levels 2, 3, 4, 5 and standpipe to be completed at a later date.

Contact - Ken Orahood - ###-#### 30 min prior to Hydro Insp start on levels 1, 2 4 ; 5 please

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in6/8/20186/11/20186/11/2018APASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping above ceiling grid on level 1 complete, approved for cover.

Contact Ken Orahood ###-#### 30 Min prior to RTC 1st Floor Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in6/8/20186/11/20186/8/2018ACANC
DetailsJim Page
Contact - Ken Orahood - 208-297- 9090 30min prior to RTC Insp Start please.

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
INSP-Sprinkler Rough-in5/11/20185/14/20185/14/2018APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping above hardlids in level 1 east hallway, west conference room and swimming pool area complete, areas inspected approved for cover.

Contact Ken Orahood ###-#### 30 min prior to 1st floor rough in ; hard lid inspection start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in5/7/20185/8/20185/8/2018APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping above hardlids in main lobby complete, main lobby approved for cover from west of the elevators to the banquet rooms, other rooms off of lobby on level 1 to be inspected at a later date.

Contact Ken Orahood - ###-#### 30 Min Prior to RTC Insp on Lobby Areas please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in4/27/20184/27/20184/27/2018PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in hotel guest rooms on level 1 northeast side complete, hotels rooms on level 1 northeast side approved for cover.
INSP-Sprinkler Rough-in4/11/20184/12/20184/12/2018APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in the 28 room on levels 2,3,4 and 5 complete, approved for cover. Rough to cover inspection for overhead fire sprinkler piping in elevator lobbies on levels 2,3,4 and 5 complete, approved for cover.
INSP-Supply line flush3/29/20183/29/20183/29/2018PPART
DetailsJim Page
Rough to cover inspection for overead fire sprinkler piping above hardlids on levels 2, 3, 4 and 5 complete, hardlids approved for cover.
INSP-Sprinkler Rough-in3/23/20183/23/20183/23/2018PPART
DetailsJim Page
Rough to cover inspection for levels 4 and 5 corridors complete, approved for cover.
INSP-Sprinkler Rough-in2/22/20182/22/20182/22/2018PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping located in level 2, 3, and 4 linen/Ice sooms complete as well as added heads on west stairs landings complete, approved for cover.
INSP-Sprinkler Rough-in1/31/20182/1/20182/1/2018APART
DetailsJim Page
Rough to cover inspection for rooms on level 5 complete and approved for cover with exception to elevator lobby and room 528, lobby and 528 are not approved for cover.
INSP-Sprinkler Rough-in12/11/201712/12/201712/12/2017APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping on level 4 west of elevator lobby complete, level 4 west of elevator lobby approved for cover.
INSP-Sprinkler Rough-in12/5/201712/6/201712/6/2017APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping on level 5 east of room 511 complete, rooms east of 511 on level 5 approved for cover with exception to room 512, room 512 will be inspected at a later date.
INSP-Sprinkler Rough-in11/29/201711/30/201711/30/2017APART
DetailsJim Page
Rough to cover inspection for level 3 west side complete, level 3 west side approved for cover.
INSP-Sprinkler Rough-in11/14/201711/17/201711/17/2017APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping on level 2 complete, level 2 hardlids approved for cover.
INSP-Sprinkler Rough-in11/7/201711/8/201711/8/2017APART
DetailsJim Page
Partial rough to cover inspection complete on overhead fire sprinkler piping on level 4, notated city approved plans in jobshack with pink highlighter/red ink areas approved for cover.
INSP-Sprinkler Rough-in10/20/201710/23/201710/23/2017APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping located above the sheetrock in corridors (corridors only), east side of elevator lobby on levels 2 and 3 complete, approved for cover.
INSP-Sprinkler Rough-in10/19/201710/19/201710/19/2017PPART
DetailsJim Page
Rough to cover for overhead fire sprinkler piping on southside of level 4 complete as well as northside level 4 east of the elevator lobby, areas inspected are approved for cover.
Sprinkler Plan Check10/19/2017 10/19/2017 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  10/19/2017 DONE
DetailsTim Frost
Permit Ready to Issue  10/19/2017 DONE
DO NOT REISSUE PLAN MOD
CHANGE STATUS TO (ISS)  10/19/2017 DONE
Plan mod
(F) Reprint permit  10/19/2017 DONE
Intake Approval  10/9/2017 PASS
Plan assigned to (Tim)10/9/2017 10/9/2017 DONE
DetailsTim Frost
Sprinkler Plan Check10/9/2017 10/9/2017 FAIL
DetailsTim Frost
Plan Modification Accepted  10/5/2017 DONE
Plan assigned to (Tim)10/5/2017 10/5/2017 DONE
DetailsTim Frost
Sprinkler Plan Check10/5/2017 10/5/2017 FAIL
DetailsTim Frost
INSP-Sprinkler Rough-in9/29/201710/2/201710/2/2017AFAIL
DetailsJim Page
Installation plans do not match the city approved drawings, installation of fire sprinkler piping needs to match the city approved drawings, cover is not approved for requested area's (Partial corridor cover request on levels 3, 4 and 5). Insulation is installed in area's where cover has not been approved, any fire sprinkler piping that is covered before inspection is completed will have any and all cover material removed for a correct inspection to be performed.
INSP-Sprinkler Rough-in9/28/20179/29/20179/29/2017ACANC
DetailsJim Page
Contact Hunter Anderson ###-#### 30 min prior to RTC Insp start please.
RTC Partial on Hall Ways.

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
INSP-Sprinkler Rough-in9/19/20179/20/20179/20/2017PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping located above the pre-rock in the corridor on the level 2 complete, notated the city approved drawings with red ink area's approved for cover. Approved plans for inspections is located in the job shack. Noted that I spoke with the superintendent with Headwaters Construction (Chris Stanton, phone number ###-####) about a temporary standpipe being installed, note number 42 of the building permit fire code review gives the specifics of the temporary standpipe being required.
INSP-Sprinkler Rough-in9/19/20179/20/20179/19/2017PCANC
DetailsJim Page
Contact Perly Daniel ###-#### 30 min prior to RTC Insp. start please.

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
INSP-Sprinkler Rough-in/Hydro9/5/20179/5/20179/5/2017PPASS
DetailsJim Page
Underground supply hydrostatic test complete
Sprinkler Plan Check6/19/2017 6/19/2017 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  6/19/2017 DONE
DetailsTim Frost
Permit Ready to Issue  6/19/2017 DONE
Issue and Print Permit  6/19/2017 DONE
Inspection Record Card- Fire6/19/2017 6/19/2017 DONE
DetailsCandy A. Nichols
Sprinkler Plan Check6/1/2017 6/1/2017 FAIL
DetailsTim Frost
1st review completed  6/1/2017 FAIL
DetailsTim Frost
Miscellaneous action  6/1/2017 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Intake Approval  5/31/2017 PASS
Plan assigned to (Tim)5/31/2017 5/31/2017 DONE
DetailsTim Frost
Application received  5/30/2017 DONE
Application submitted via PDS Online on May 30 2017 1:11PM