INSP-Final Inspection | 9/7/2017 | 9/7/2017 | 9/7/2017 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 8/4/2017 | 8/7/2017 | 8/7/2017 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
|
Plan assigned to (Tim) | 7/28/2017 | | 8/2/2017 | | DONE |
Tim Frost
|
|
|
|
Plan Modification Accepted | | | 8/2/2017 | | PASS |
Scott Arellano
|
|
|
Plan modification to add an additional 24 SSU's around new ductwork, plug 6 existing heads, and relocate 3 SSP's. Designer confirmed existing hydraulic calculations will support additional heads.
Additional $105.00 fee for plan mod.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/2/2017 | | DONE |
Scott Arellano
|
|
|
|
Permit Ready to Issue | | | 8/2/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/2/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/2/2017 | | 8/2/2017 | | DONE |
Brittany Hill
|
|
|
|
Plan Modification Accepted | | | 7/28/2017 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 7/20/2017 | 7/20/2017 | 7/20/2017 | P | PART |
Troy Cobbley
|
|
|
Rouugh-in passed for the most part and piping can be covered. I noted many locations where upright sprinkler coverage is blocked by duct work. This will need addressed prior to a final.
Payton Phone #: ###-####
|
Intake Approval | | | 6/5/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 6/5/2017 | | 6/5/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/5/2017 | | 6/5/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 6/5/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/5/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/5/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/5/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/5/2017 | | 6/5/2017 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | | 6/2/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 2 2017 10:55AM
|