INSP-Final Inspection | 8/17/2017 | 8/17/2017 | 8/17/2017 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work passed/complete
|
INSP-Final Inspection | 8/14/2017 | 8/16/2017 | 8/16/2017 | A | FAIL |
Jim Page
|
|
|
Fire sprinkler head in northwest corridor next to handwash sink, electrical closets is overspaced. Sprinkler head above handwash sink needs to be changed to a quick response head. Fire sprinkler heads located in level 4 elevator lobby need to be changed to quick response heads.
|
INSP-Sprinkler Rough-in | 8/2/2017 | 8/3/2017 | 8/3/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/pendant heads complete in area of work, area of work approved for cover.
|
INSP-Sprinkler Rough-in | 6/28/2017 | 6/29/2017 | 6/29/2017 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/pendant heads located above hardlids complete, approved for cover.
|
Intake Approval | | | 6/13/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 6/13/2017 | | 6/13/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/13/2017 | | 6/13/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 6/13/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/13/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/13/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/13/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/13/2017 | | 6/13/2017 | | DONE |
Brittany Hill
|
|
|
|
Application received | | | 6/7/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 7 2017 3:25PM
|