INSP-Final Inspection | 8/12/2019 | 8/13/2019 | 8/13/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Clarence 51 Deluge Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Sprinkler Rough-in | 8/13/2019 | 8/13/2019 | 8/13/2019 | A | PASS |
Jim Page
|
|
|
Rough in inspection for this system has been completed.
|
INSP-Sprinkler Rough-in/Hydro | 8/13/2019 | 8/13/2019 | 8/13/2019 | A | DONE |
Jim Page
|
|
|
Hydrostatic test has been witnessed for this system, no pressure loss was observed.
|
Fees Due Hold | 6/22/2017 | | 9/13/2017 | | DONE |
Brittany Hill
|
|
|
|
Fees Due Hold | 6/17/2017 | | 6/21/2017 | | DONE |
Christina Prado
|
|
|
|
Fees Due Hold | 6/13/2017 | | 6/16/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/12/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 6/12/2017 | | 6/12/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/12/2017 | | 6/12/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 6/12/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/12/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/12/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/12/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/12/2017 | | 6/12/2017 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 6/9/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 9 2017 2:17PM
|