INSP-Final Inspection | 8/12/2019 | 8/13/2019 | 8/13/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for scope of work complete.
Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Sprinkler Rough-in/Hydro | 8/13/2019 | 8/13/2019 | 8/13/2019 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for this system has been witnessed, no pressure loss was observed.
|
INSP-Sprinkler Rough-in | 8/13/2019 | 8/13/2019 | 8/13/2019 | A | PASS |
Jim Page
|
|
|
Rough in inspection for this system has been completed.
|
Fees Due Hold | 1/9/2018 | | 1/22/2018 | | DONE |
Brittany Hill
|
|
|
|
Issue and Print Permit | | | 1/8/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 1/8/2018 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/5/2018 | | 1/5/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/5/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/5/2018 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 1/5/2018 | | 1/5/2018 | | DONE |
Tim Frost
|
|
|
|
Intake Approval | | | 1/5/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/19/2017 | | 12/20/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/19/2017 | | 12/20/2017 | | FAIL |
Tim Frost
|
|
|
|
Intake Approval | | | 12/19/2017 | | PASS |
|
|
|
|
Application received | | | 6/19/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 19 2017 6:39AM
|