INSP-Final Inspection | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Sprinkler Plan Check | 10/11/2017 | | 10/11/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/11/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 10/11/2017 | | DONE |
|
|
|
DO NOT REISSUE (No Fee pre Tim Frost)
|
CHANGE STATUS TO (ISS) | | | 10/11/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/11/2017 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 10/9/2017 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 10/9/2017 | | 10/9/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/9/2017 | | 10/9/2017 | | FAIL |
Tim Frost
|
|
|
|
INSP-Supply line flush | 10/5/2017 | 10/5/2017 | 10/5/2017 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed. Still need as-builts per previous cover inspection notes.
|
INSP-Supply line flush | 10/4/2017 | 10/5/2017 | 10/5/2017 | A | CANC |
Troy Cobbley
|
|
|
Contact Brad Westbrook ###-#### 30 min prior to Flush Insp start please, this has been scheduled with SUEZ for 10AM contact is Stacy Stuart ###-####-0433. Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|
INSP-Sprinkler Rough-in/Hydro | 8/31/2017 | 8/31/2017 | 8/31/2017 | P | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed
|
INSP-Sprinkler Rough-in | 7/18/2017 | 7/18/2017 | 7/18/2017 | A | PART |
Troy Cobbley
|
|
|
Underground supply piping is ok to cover but as-builts are required showing the multiple offsets required due to the power transformer.
|
Application received | | | 6/19/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 19 2017 10:02AM
|
Intake Approval | | | 6/19/2017 | | PASS |
|
|
|
|
Sprinkler Plan Check | 6/19/2017 | | 6/19/2017 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 6/19/2017 | | 6/19/2017 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/19/2017 | | DONE |
|
|
|
|
1st review completed | | | 6/19/2017 | | PASS |
|
|
|
|
Permit Ready to Issue | | | 6/19/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/19/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/19/2017 | | 6/19/2017 | | DONE |
Brittany Hill
|
|
|
|