Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR17-00325
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 7742 W EMERALD ST
Project NameMarena Bldg 8
Customer Number 
ePlanReviewYes
Description
[Marena Building #8]
The fire sprinkler scope of work consists of two level four plex protected per NFPA 13R. The top level will have the piping tented. The sprinklers are residential type.

[BLD16-04312]
For the construction of a 3,680 sq. ft. 2 story 4 plex with work to include general site work and construction of the building per the approved plans. This building is fully fire sprinklered for R-2 occupancy. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/8/201712/11/201712/11/2017APASS
DetailsJim Page
Final fire sprinkler inspection complete.
INSP-Sprinkler Rough-in/Hydro12/8/201712/8/201712/8/2017PDONE
DetailsTroy Cobbley
Overhead hydro test complete
INSP-Supply line flush12/1/201712/5/201712/5/2017APASS
DetailsTroy Cobbley
Underground flush passed

Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in10/27/201710/30/201710/30/2017PPASS
DetailsTroy Cobbley
Rough-in passed. Tenting passed. Piping can be covered
INSP-Sprinkler Rough-in9/25/20179/26/20179/26/2017PPASS
DetailsTroy Cobbley
Underground rough to cover passed. Piping can be covered.
Permit Ready to Issue  6/27/2017 DONE
Issue and Print Permit  6/27/2017 DONE
Inspection Record Card- Fire6/27/2017 6/27/2017 DONE
DetailsTiffany Carson-Herker
Intake Approval  6/26/2017 PASS
Plan assigned to (Tim)6/26/2017 6/26/2017 DONE
DetailsTim Frost
Sprinkler Plan Check6/26/2017 6/26/2017 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  6/26/2017 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  6/26/2017 DONE
DetailsTim Frost
Application received  6/22/2017 DONE
Application submitted via PDS Online on Jun 22 2017 12:23PM